My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 23 - Construction Contract for the Portola Splash Pad Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
01/20/2026
>
Item 23 - Construction Contract for the Portola Splash Pad Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2026 2:50:11 PM
Creation date
1/14/2026 9:43:55 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23
Date
1/20/2026
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 24-2401 <br />PORTOLA SPLASH PAD <br />ADDITIONAL REFERENCES <br />The following are the names, addresses, and telephone numbers for THREE public agencies for <br />which the BIDDER or Subcontractor has performed similar work in the past five years. <br />1, Coast Community College District / 1370 Adams Ave. Costa Mesa, CA 92626 <br />Name and Address of Owner. <br />Jim Rivadeneyra / (909) 833-1145 <br />Name and Telephone Number of person familiar with project. <br />Remodel second Floor of Nursing per attached plans to Include 4 hospital style roams, <br />$742,200.00 reconfigure HVAC, plumbing, electrical, fire life safety devices, and adding AN equipment <br />1 Z/ZO/2024 <br />Contract Amount Type of Work <br />Date Completed <br />2, City of Rancho Cucamonga / 10500 Civic Center Drive Rancho Cucamonga, CA 91730 <br />Name and Address of owner. <br />Shane Adams / (909) 477-2770 <br />Name and Telephone Number of person familiar with project. <br />$753,620.00 Remodeling of Several Department including Carpet and Ceiling Replacement <br />08/19/2022 <br />Contract Amount Type of Work <br />Date Completed <br />3, North Orange County Community College District / 1830 W Romneya Dr. 8th Floor Anaheim, CA 92801 <br />Name and Address of owner. <br />Larry Lara / (714) 992-7025 <br />Name and Telephone Number of person familiar with project. <br />The Replacement of an Existing 40-Foot Long Section of the Existing <br />$1,098,000.00 Campus Underground Concrete Utility Tunnel <br />9/1 /2023 <br />Contract Amount Type of Work <br />Date Completed <br />P-11 of P-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.