Laserfiche WebLink
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 24-2401 <br />PORTOLA SPLASH PAD <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />15 <br />Thermal Moisture Protection <br />1 <br />LS <br />$ 50,000 <br />$ 307000 <br />16 <br />Doors and Windows <br />1 <br />LS <br />$ 30, 000 <br />$50, 000 <br />17 <br />Finishes <br />1 <br />LS <br />$507000 <br />$50,000 <br />18 <br />Building Specialties <br />1 <br />LS <br />$ 8 0, 0 0 0 <br />$ 8 0, 0 0 0 <br />19 <br />Plumbing <br />1 <br />LS <br />$505000 <br />$50,000 <br />20 <br />Electrical <br />1 <br />LS <br />$505000 <br />$50,000 <br />21 <br />Remove and Replace Existing Benches <br />at Baseball Fields <br />1 <br />LS <br />$30, 000 <br />$50,000 <br />22 <br />Remove and Replace Existing Baseball <br />Field Fencing, Dugouts, and Backstops <br />1 <br />LS <br />$ 5 0, 0 0 0$ <br />5 0, 0 0 0 <br />23 <br />Construction Allowance* <br />1 <br />LS <br />$100,000 <br />$100,000 <br />24 <br />Project Advertisement Sign <br />1 <br />LS <br />57000 <br />51000 <br />25 <br />As -Built Plans <br />1 <br />LS <br />47000 <br />45000 <br />TOTAL BASE BID $ 1 ,9745000 <br />The lowest responsible bidder shall be selected based on the total base bid. The City reserves the <br />right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any). <br />* The quantity for this bid item is shown for bid comparison only. This bid item shall not be <br />subject to the "25%" limit as stated in Section 7-3.5 of the Standard Specifications. The actual <br />amount for this item will be dictated by the actual quantity used, and the Agency reserves the <br />right to increase or decrease the quantity of this item accordingly. <br />f This bid item is considered a Specialty Item per Section 3-2 of the Standard Specifications. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIOUIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown <br />above, within ninety (90) working days after the commencement date stated in the Notice to <br />P-2 of P-19 <br />