Laserfiche WebLink
Project Name: Centennial Park Playground I Project #: 245379 <br />Control System ID:1 of t <br />Equipment Layout and Connection Details Distribution Panel Location/ID: Service 1 <br />Control cabinet location(s) <br />I � 1 <br />12a) <br />0 <br />I a� <br />a <br />i <br />la Line power to contactors, and equipment grounding conductor. Requires one <br />circuit per contactor, size wiring per load and voltage drop, <br />1 b Load power from contactors, and equipment grounding conductor. Requires <br />one circuit per contactor, size wiring per load and voltage drop. <br />2a Control power with equipment ground to control cabinet. Requires dedicated <br />20 A circuit. Provide transformer if control voltage not present. <br />Lighting system <br />- — <br />I I <br />I I <br />I I <br />I <br />I , <br />I 1 <br />I <br />�I I <br />I' <br />Equipment <br />Description <br />1 Control and monitoring cabinet - <br />primary <br />Sales Representative: Mike Marchetti I Project Engineer: Daniel Lohman I Scan: 245379A I Document ID: 245379P1 Vi C2-o526143701 <br />OCC0 <br />rmsm <br />Page 2 of 3 -- 26-May-2025 <br />