My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2026-02-03
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
02/03/2026 Regular
>
Agenda Packet_2026-02-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2026 8:51:31 AM
Creation date
1/28/2026 8:46:46 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
City Council
Date
2/3/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CUP No. 1982-18-MOD-1 — Forty Martyrs Armenian Church Middle School (5311 W. <br /> McFadden Avenue) <br /> October 27, 2025 <br /> Page 6 <br /> Students in grades five through eight will continue to attend weekly religion classes in the <br /> on-site church during regular school hours. These classes will not conflict with church <br /> services or create additional operational impacts. Moreover, the school year will continue <br /> to operate on the current academic calendar (August through June) with limited summer <br /> programming. No new evening or weekend activities are proposed beyond those already <br /> in place, ensuring that the expanded program remains consistent with existing operations. <br /> Noise and Lighting <br /> The Project will not create significant noise or lighting impacts. Outdoor play areas will <br /> remain as they are, and no new outdoor facilities are proposed. Staggered recess periods <br /> will continue to minimize outdoor activity at any one time. No amplified outdoor sound <br /> equipment is proposed, and all activities will continue to comply with the City's noise <br /> ordinance (SAMC Chapter 18). <br /> The new building will include standard security lighting for safety. All fixtures will be <br /> equipped with dimmer switches. Additionally, the fixtures will be shielded and directed <br /> downward to prevent glare or spillover onto adjacent residential properties. The Project <br /> will continue to comply with the City's outdoor lighting standards, ensuring that nighttime <br /> illumination is limited to what is necessary for security. Because the expansion involves <br /> only a small increase in enrollment and no significant changes to outdoor facilities or <br /> lighting, it will not alter the acoustic or visual environment of the surrounding <br /> neighborhood. <br /> Traffic and Circulation <br /> The Project will not result in significant traffic or circulation impacts. A focused traffic study <br /> determined that the modest enrollment increase, primarily due to retaining existing <br /> students, will not generate substantial additional vehicle trips during peak periods. The <br /> school effectively manages circulation through staggered dismissal times, 3:10 p.m. for <br /> kindergarten through sixth grade, earlier pick-ups for preschool, and 3:30-5:30 p.m. for <br /> after-school programs. Staff-supervised loading zones and on-site security personnel will <br /> continue to ensure orderly circulation and pedestrian safety. <br /> Compatibility with Surrounding Uses <br /> The Project site is surrounded by residential neighborhoods to the north and west, a <br /> commercial and cultural center to the east, and other religious and educational facilities <br /> to the south. Primary access from McFadden Avenue limits traffic intrusion into nearby <br /> residential areas. The proposed two-story building's contemporary architectural design <br /> complements the existing church and school facilities and enhances the overall campus <br /> character. Its location at the rear of the property reduces visual impacts on neighboring <br /> streets and residences. <br /> Overall, the Project is compatible with surrounding institutional and residential uses and <br /> will not introduce new adverse impacts related to traffic, noise, or lighting. With <br /> compliance with the City's operational standards and conditions of approval, the Project <br /> City Council 18 — 58 2/3/2026 <br />
The URL can be used to link to this page
Your browser does not support the video tag.