My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2026-02-03
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
02/03/2026 Regular
>
Agenda Packet_2026-02-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2026 8:51:31 AM
Creation date
1/28/2026 8:46:46 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
City Council
Date
2/3/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Forty Martyrs Armenian Church Middle School March 17, 2025 <br /> 5311 West McFadden Ave, Santa Ana Focused Traffic Impact Study <br /> PRE-PROJECT COMPLETION <br /> Traffic conditions prior to completion of the proposed development is estimated by <br /> applying an annual growth rate of one percent (1%) over existing traffic counts for the <br /> opening year 2026 conditions. Traffic volumes for the pre-project completion are <br /> illustrated in Exhibit 8. <br /> The LOS using ICU methodology and intersection V/C ratios are shown in Table 9. A <br /> shown, the study intersection remains operating at LOS D or better for the project <br /> opening year in the AM and PM peak hours. The analysis worksheets can be found in <br /> Appendix "B". <br /> Table 9. Pre-Project Completion (2026) Conditions— ICU Analysis <br /> Intersection AM Peak Hour PM Peak Hour <br /> LOS V/C LOS V/C <br /> McFadden Ave at Euclid St C 0.797 D 0.827 <br /> Table 10 summarizes the results of LOS analysis based on roadway segment ADT <br /> analysis. As shown, McFadden Avenue at the site frontage will maintain operating at <br /> LOS "A" for the project opening year 2026. <br /> Table 10. Pre-Project Completion (2026) Conditions— Roadway Segment Analysis <br /> Roadwav Classification ADT LOS <br /> McFadden Ave Secondary Arterial 14,736 A <br /> K2 Traffic Engineering, Inc. 18 <br /> City Council 18 — 100 2/3/2026 <br />
The URL can be used to link to this page
Your browser does not support the video tag.