Laserfiche WebLink
Forty Martyrs Armenian Church Middle School March 17, 2025 <br /> 5311 West McFadden Ave, Santa Ana Focused Traffic Impact Study <br /> PRE-PROJECT COMPLETION <br /> Traffic conditions prior to completion of the proposed development is estimated by <br /> applying an annual growth rate of one percent (1%) over existing traffic counts for the <br /> opening year 2026 conditions. Traffic volumes for the pre-project completion are <br /> illustrated in Exhibit 8. <br /> The LOS using ICU methodology and intersection V/C ratios are shown in Table 9. A <br /> shown, the study intersection remains operating at LOS D or better for the project <br /> opening year in the AM and PM peak hours. The analysis worksheets can be found in <br /> Appendix "B". <br /> Table 9. Pre-Project Completion (2026) Conditions— ICU Analysis <br /> Intersection AM Peak Hour PM Peak Hour <br /> LOS V/C LOS V/C <br /> McFadden Ave at Euclid St C 0.797 D 0.827 <br /> Table 10 summarizes the results of LOS analysis based on roadway segment ADT <br /> analysis. As shown, McFadden Avenue at the site frontage will maintain operating at <br /> LOS "A" for the project opening year 2026. <br /> Table 10. Pre-Project Completion (2026) Conditions— Roadway Segment Analysis <br /> Roadwav Classification ADT LOS <br /> McFadden Ave Secondary Arterial 14,736 A <br /> K2 Traffic Engineering, Inc. 18 <br /> City Council 18 — 100 2/3/2026 <br />