Laserfiche WebLink
Forty Martyrs Armenian Church Middle School March 17, 2025 <br /> 5311 West McFadden Ave, Santa Ana Focused Traffic Impact Study <br /> POST-PROJECT COMPLETION <br /> Traffic volumes for project opening year 2026 plus project traffic are illustrated in <br /> Exhibit 9. The LOS using ICU methodology and intersection V/C ratios are shown in <br /> Table 11. The studied intersection will remain LOS D or better for Sunday midday peak <br /> hour and for weekday AM and PM peak hours. <br /> Table 11. Post-Project Completion (2026) Conditions— ICU Analysis <br /> Intersection AM Peak Hour PM Peak Hour <br /> LOS V/C LOS V/C <br /> McFadden Ave at Euclid St C 0.799 D 0.828 <br /> Table 12 summarizes the results of LOS analysis based on roadway segment ADT <br /> analysis. As shown, McFadden Avenue at the site frontage will maintain operating at <br /> LOS "A" under project opening year plus project scenario. <br /> Table 12. Post-Project Completion (2026) Conditions— Roadway Segment Analysis <br /> Roadway Classification ADT LOS <br /> McFadden Ave Secondary Arterial 14,480 A <br /> K2 Traffic Engineering, Inc. 20 <br /> City Council 18 — 102 2/3/2026 <br />