My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2026-02-03
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
02/03/2026 Regular
>
Agenda Packet_2026-02-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2026 8:51:31 AM
Creation date
1/28/2026 8:46:46 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
City Council
Date
2/3/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Forty Martyrs Armenian Church Middle School March 17, 2025 <br /> 5311 West McFadden Ave, Santa Ana Focused Traffic Impact Study <br /> PROPOSED DROP-OFF AND PICK-UP FOR MIDDLE SCHOOL <br /> Consistent with the existing school for PK-6, the proposed middle school will be open on <br /> weekdays only with no concurrent church activity. After project completion, the <br /> proposed middle school expects to enroll up to ten students in 7th grade only in the first <br /> school year. Total enrollment may gradually increase up to twenty students in both 7th <br /> and 8th grades combined in the following years. The maximum capacity of the proposed <br /> middle school is 32 students. The proposed middle school will enroll four (4) staff <br /> members/teachers. <br /> Drop-off for middle school students would take place between 8:20 AM and 8:30 AM. As <br /> the drop-off time is staggered from all other students, it is reasonably expected that <br /> similar order and efficiency can be maintained for middle school students. If necessary, <br /> staggered arrival times may be further adjusted to ensure orderly traffic. The project is <br /> expected to have no or minimal impact for drop-off and pick-up activities. <br /> SITE ACCESS <br /> The project site maintains two existing access driveways on McFadden Avenue. The <br /> west driveway provides ingress and egress access in both directions. The east driveway <br /> allows egress traffic only. Site access has been operating for years without issue. It is <br /> necessary that the height of shrubs, planting, and other visual obstructions be limited to <br /> a maximum height of thirty inches to maintain sufficient corner sight distance at the <br /> driveways. <br /> ON-SITE CIRCULATION <br /> On-site circulation appears efficient and safe without unnecessary bottlenecks. In <br /> general, the likelihoods of on-site congestion and traffic queue are low. The site plan is <br /> subject to review and approval by the Fire Department, Planning Department and Traffic <br /> Engineer. <br /> K2 Traffic Engineering, Inc. 26 <br /> City Council 18 — 108 2/3/2026 <br />
The URL can be used to link to this page
Your browser does not support the video tag.