Laserfiche WebLink
Appeal Application No. 2025-02 — Forty Martyrs Armenian Church Middle School (5311 <br /> W. McFadden Avenue) <br /> stating that cumulative impact analysis is required only when a project may <br /> contribute to a cumulatively considerable significant environmental impact. If a <br /> project's contribution to cumulative impacts is not cumulatively considerable, no <br /> further cumulative analysis is required. <br /> As proposed, the project does not have cumulative impacts that are considerable <br /> and qualifies for an exemption from further CEQA review pursuant to CEQA <br /> Guidelines Section 15314 (Class 14). Class 14 exempts minor additions to existing <br /> schools from CEQA review when the addition does not increase original student <br /> capacity by more than 25 percent or ten classrooms, whichever is less. <br /> The proposed school expansion would result in an eight percent increase in <br /> student enrollment and includes a total of five new classrooms, which is well within <br /> the thresholds established under the Class 14 exemption. As a result, the project <br /> is exempt from the requirement to prepare an Environmental Impact Report, and <br /> the lead agency is therefore not required to certify an EIR for this project. <br /> As previously stated, the City's review of a new development project is limited to <br /> evaluating the proposed project itself and ensuring that it meets all applicable <br /> federal, state, and local laws. <br /> 9. Appellant Request: Failure to Consider Feasible or Less Intrusive Alternatives <br /> Analysis of Issue: <br /> Projects that are categorically exempt from further environmental analysis are not <br /> required to prepared alternative design or site plan analysis. Furthermore, as <br /> previously stated and discussed in the Planning Commission staff report and <br /> resolution (Exhibit 3 to the February 3, 2026 City Council staff report), the project <br /> undergoes a development project review where City staff ensures compliance with <br /> Federal, State, and City codes. As such, staff must ensure that the project <br /> complies with zoning regulations, which require compliance with development <br /> standards including, but not limited to the following: <br /> • Setbacks from property lines <br /> • Adequate landscape <br /> • Design quality <br /> • Building Height <br /> The proposed project's location, lot configuration, proximity to residential <br /> properties, and existing construction limit the options available to construct the <br /> desired addition to the school. Reconfiguring the floor plan of the existing school <br /> building would not be a feasible option, as the project is responsible for compliance <br /> with Chapter 3 Occupancy Classification and Use) of the California Building Code <br /> Exhibit 6 — Response to Appeal Comments <br /> ity ounci 18 — 167 2/3/2026 <br />