Laserfiche WebLink
Forty Martyrs Armenian Church Middle School March 17, 2025 <br />5311 West McFadden Ave, Santa Ana Focused Traffic Impact Study <br /> <br />K2 Traffic Engineering, Inc. 20 <br />POST-PROJECT COMPLETION <br />Traffic volumes for project opening year 2026 plus project traffic are illustrated in <br />Exhibit 9. The LOS using ICU methodology and intersection V/C ratios are shown in <br />Table 11. The studied intersection will remain LOS D or better for Sunday midday peak <br />hour and for weekday AM and PM peak hours. <br />Table 11. Post-Project Completion (2026) Conditions – ICU Analysis <br />Intersection AM Peak Hour PM Peak Hour <br />LOS V/C LOS V/C <br />McFadden Ave at Euclid St C 0.799 D 0.828 <br />Table 12 summarizes the results of LOS analysis based on roadway segment ADT <br />analysis. As shown, McFadden Avenue at the site frontage will maintain operating at <br />LOS "A" under project opening year plus project scenario. <br />Table 12. Post-Project Completion (2026) Conditions – Roadway Segment Analysis <br />Roadway Classification ADT LOS <br />McFadden Ave Secondary Arterial 14,480 A <br /> <br />