My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Appeal Application of Conditional Use Permit to Allow the Expansion of a Private School
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
02/03/2026
>
Item 18 - Appeal Application of Conditional Use Permit to Allow the Expansion of a Private School
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2026 10:11:01 AM
Creation date
1/28/2026 10:09:39 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
18
Date
2/3/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Forty Martyrs Armenian Church Middle School March 17, 2025 <br />5311 West McFadden Ave, Santa Ana Focused Traffic Impact Study <br /> <br />K2 Traffic Engineering, Inc. 22 <br />THRESHOLD OF SIGNIFICANT IMPACT <br />Consistent with 2017 Orange County Congestion Management Plan, the City of Santa <br />Ana adopted LOS “D” as the maximum threshold of significance at all intersections. <br />Based on existing conditions, the traffic impacts of the proposed project are shown in <br />Table 13. The study intersection is expected to maintain LOS “D” or better for both AM <br />and PM peak hours, with and without proposed project. The project does not have <br />significant traffic impacts, and mitigation measure is, therefore, not required. <br />Table 13. Project Impact Analysis – Existing Conditions <br />W/O Project With Project <br /> <br />Study Intersection: <br />McFadden Ave at Euclid St LOS V/C LOS V/C <br />V/C <br />Change <br />Acceptable <br />LOS <br />Significant <br />Impact <br />AM Peak Hour C 0.790 D 0.792 0.002 Yes No <br />PM Peak Hour D 0.821 D 0.821 - Yes No <br />The traffic impacts of the proposed project for opening year are shown in Table 14. The <br />study intersection is expected to maintain LOS “D” or better for both AM and PM peak <br />hours in the project opening year, with and without the proposed project. Based on the <br />threshold shown above, the project does not have a significant traffic impact. Mitigation <br />measure is, therefore, not required. <br />Table 14. Project Impact Analysis – Opening Year (2026) <br />W/O Project With Project <br /> <br />Study Intersection: <br />McFadden Ave at Euclid St LOS V/C LOS V/C <br />V/C <br />Change <br />Acceptable <br />LOS <br />Significant <br />Impact <br />AM Peak Hour C 0.797 C 0.799 0.002 Yes No <br />PM Peak Hour D 0.827 D 0.828 0.001 Yes No <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.