My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Appeal Application of Conditional Use Permit to Allow the Expansion of a Private School
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
02/03/2026
>
Item 18 - Appeal Application of Conditional Use Permit to Allow the Expansion of a Private School
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2026 10:11:01 AM
Creation date
1/28/2026 10:09:39 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
18
Date
2/3/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mano Dishoian <br />November 8, 2022 <br />Page 5 <br /> <br />N:\4600\2224606 - Forty Martyrs Armenian Church - Middle School Project, Santa Ana\Report\4606 FMA Church - Middle School Project 11-8-2022.docx <br />in 28 additional parking spaces being required. Applying the additional parking <br />requirement of 28 spaces to the existing peak demand of 56 spaces result in a peak <br />parking requirement of 84 spaces. Direct comparison of the peak demand of 84 spaces <br />applied to the proposed supply of 88 would result in a surplus of 4 spaces. As such, the <br />proposed site plan provides adequate parking to support the added classroom building. <br />It is likely a small amount of parents will continue to utilize the Armenian Center <br />parking lot adjacent to the site which will result in additional surpluses beyond what is <br />reported. <br /> <br />As an alternative approach, an empirical parking ratio can be calculated by taking the <br />56-space demand and dividing it by the 144-student attendance on that day which <br />translates to a peak parking ratio of 0.389 space per student. If a contingency of 15% <br />were applied the empirical ratio of 0.389, it would translate to an adjusted peak <br />“design” parking ratio of 0.447 space per student. Applying this design parking ratio to <br />the Project’s proposed parking supply of 88 spaces results in a maximum student <br />enrollment of 197 students or an increase in enrollment of 48 students (197 max <br />enrollment – 149 current enrollment). <br /> <br />Although no changes are proposed to the Church, parking demand counts were <br />collected to identify peak parking needs which could be compared to the proposed <br />supply. Table 2 presents the count data during a typical service time. Review of Table <br />2 shows a peak utilization of 46 spaces at 12:30 which translates to an empirical parking <br />ratio of 0.81 spaces per parishioner in attendance. Direct comparison to the proposed <br />supply of 88 spaces results in a parking surplus of 42 spaces. As such, the proposed <br />parking supply will provide adequate parking to support the existing church demands. <br />In the event the church had a full attendance (210 seats) the site would need to use off- <br />site parking at the adjacent Armenian Center. <br /> <br /> <br />CONCLUSION <br />As noted above, the Project would require an additional 28 spaces beyond the 56 spaces <br />that are already needed for the school. This would result in a total parking requirement <br />of 84 spaces which when compared to the proposed parking supply of 88 spaces would <br />result in a surplus of 4 spaces. Additionally, based on the proposed parking supply the <br />student enrollment could be increased to 197 students and still provide adequate <br />parking. As such, it can be concluded that the proposed Project would have adequate <br />parking to accommodate existing and future parking demands related to the school. In <br />addition, the existing church would result in a surplus of 42 spaces when compared to <br />the proposed supply. Therefore, the proposed supply of 88 spaces will provide adequate <br />parking to support both existing and future school/church activities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.