My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Appeal Application of Conditional Use Permit to Allow the Expansion of a Private School
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
02/03/2026
>
Item 18 - Appeal Application of Conditional Use Permit to Allow the Expansion of a Private School
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2026 10:11:01 AM
Creation date
1/28/2026 10:09:39 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
18
Date
2/3/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
84-EV80-EV81-EV82-EV83-EV7475766869707172734950525154555653575859606163646667626577787932456781EXISTING CHURCH BUILDINGADJACENT BUILDING - NOT IN SCOPEADJACENT BUILDING - NOT IN SCOPEADJACENT BUILDING - NOT IN SCOPE9101112EXISTINGROOFEDTRASHENCLOSURE25262729323334363738394042432835414744454648232430311516171819202221ZERO LOT LINEZERO LOT LINEEXIT DISCHARGE LANE(20' MIN.)EXIT DISCHARGE LANE(20' MIN.)RECYCLINGTRASHFOOD WASTE1314DROP-OFF/PICK-UPDROP-OFF/PICK-UPDROP-OFF/PICK-UPDROP-OFF/PICK-UPDROP-OFF/PICK-UPDROP-OFF/PICK-UPDROP-OFF/PICK-UPDROP-OFF/PICK-UPPARKING TABULATIONEXISTING CHURCH / ELEMENTARY SCHOOL= CUP NO. 82-1VARIANCE NO. 82-2082 PARKING SPACES REQUIREDEXISTING NON-PERMITTED MULTI-PURPOSE ROOMAND STORAGE (619 S.F.) SEC. 41-1420 (a) = 4 PARKING SPACES REQUIREDNEW ELEMENTARY SCHOOL CLASSROOM BUILDING = 4,880 S.F.SEC 41-1400 ELEMENTARY SCHOOL =1.5 PARKING SPACES PER EACH CLASSROOM (5 CLASSROOMS)8 SPACES REQUIREDTOTAL = 94 SPACES REQUIRED (4 SPACES TOTAL TO BE ADA)86 SPACES PROVIDED11% SHORT ON PARKING(EV CHARGING SPACES REQUIRED (Table 5.106.5.3.3)5 EV SPACES REQUIRED / 5 PROVIDED)CITY OF SANTA ANA APPROVED TOTAL OCCUPANCY OF CHURCH BUILDING = 320K E Y N O T E S - S I T E P L A NG E N E R A L S I T E P L A N N O T E SL E G E N DLEGENDNOTESKEYNOTESA1.1SITE PLANDRAWINGS, SPECIFICATIONS, IDEAS, DESIGNS, AND ARRANGEMENTSREPRESENTED THEREBY ARE AND SHALL REMAIN THE PROPERTY OFTHE ARCHITECT. NO PART THEREOF SHALL BE REPRODUCED,COPIED, ADAPTED, DISCLOSED, DISTRIBUTED, SOLD, PUBLISHED ORUSED WITHOUT PRIOR WRITTEN CONSENT OF AND APPROPRIATECOMPENSATION TO THE ARCHITECT. VISUAL CONTACT WITH THEABOVE DRAWINGS OR SPECIFICATIONS SHALL CONSTITUTECONCLUSIVE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS.DEV. PROJECT REV. RESUBMITTALPLAN CHECK SUBMITTALDEVELOPMENT PROJECT REVIEWISSUED FOR BIDIssuanceDateDescriptionRevisionDate No. DescriptionISSUED FOR CONSTRUCTIONStamp and SignaturePhone 714.560.9210www.jgartner.comSheet TitleProject No.:Sheet No.:Print Date:ARCHITECTUREPLANNING / INTERIORSPROJECT MANAGEMENTArchitectProject Name and LocationConsultantsF O R T Y M A R T Y R S A R M E N I A N <br />C H U R C H M I D D L E S C H O O L <br />S I T E E X P A N S I O N <br />53 11 WEST MCFAD DEN AVEN UE <br />S A N T A A N A , C A 9 2 7 0 410 June 2025S I T E P L A N - N E W E D U C A T I O N B U I L D I N GExhibit 4 - Site Plan
The URL can be used to link to this page
Your browser does not support the video tag.