My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2025-04-01
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
04/01/2025 Regular
>
Agenda Packet_2025-04-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2026 4:19:43 PM
Creation date
2/18/2026 4:14:44 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
4/1/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
984
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP <br />Estimated <br />Points <br />Yes, <br />3 /115 = <br />=10 <br />=15 <br />/= <br />= <br />61 =10 <br />61 /61 = <br />=10 <br />6 <br />Yes,=5 <br />Not =0 <br />Not Implementing within 12 months = 0 <br />/= <br />75 <br />APPENDIX A: CALCULATIONS AND ESTIMATED POINTS <br />Total Estimated Points: <br /> Calculation for Total Project Cost / VMT = <br /> Participating Jurisdiction(s) <br /># of signals along entire length of corridor : <br /># of signals being synched / total # of corridor signals: <br />5. Number of Jurisdictions: (10 points) <br />6. Current Project Status (10 points) <br />4. Project Scale: (20 points) <br />$5,710,658 <br />100.0% <br />$5,710,657.50 <br />0 <br />20.00%$1,142,131.50 <br />7. Funding Match: (5 points) <br /> Retiming 75% of previous project <br />25 <br />10 <br />5 <br />1. Transportation Significance (25 points) <br />Inclusion of offset signals w/in 2,700' <br />Vehicle Miles Traveled (VMT): 367,503 <br />10 <br />5 <br />20 <br />Average project improvement score 33.6 <br /> Timing 75% of new eligible project <br /> All agencies are participating in the Countywide Baseline Project <br />Criteria (Max Points) <br /># of offset signals on project / total # of offset signals : 100.0% <br />2. Economic Effectiveness (Cost to Benefit Ratio): (10 points) <br />3. Project Characteristics: (20 points) <br />367,503 15.54 <br /> <br /> <br />City Council 18 – 70 4/1/2025
The URL can be used to link to this page
Your browser does not support the video tag.