Laserfiche WebLink
Santa Ana Zoo Overflow Parking Lot Rezone (1801 East Chestnut Avenue) <br />March 3, 2026 <br />Page 7 <br />consultation was conducted pursuant to Assembly Bill (AB) 52 and Senate Bill (SB) 18 <br />with Tribes identified by the Native American Heritage Commission. The NOI was also <br />filed with the California State Clearinghouse and the Orange County Clerk -Recorder's <br />Office. The NOI identified the availability of the Draft IS/MND and provided details on <br />where electronic copies could be accessed on the City's website, as well as the locations <br />where hard copies were available for public review, including the Public Works Agency <br />counter and the Southwest Senior Center. <br />A copy of the public notice is provided attached to this staff report as Exhibit 4. Vicinity <br />zoning and aerial view, including the 2,000-foot notification radius map, are provided in <br />Exhibit 5. At the time this report was printed, no issues of concern had been raised by <br />the public regarding the requested actions. <br />ENVIRONMENTAL IMPACT <br />Pursuant to Section 21081.6 of CEQA and Section 15097 of CEQA Guidelines, a MMRP <br />is required when a MND is certified in conjunction with project approval. The purpose of <br />the MMRP is to ensure that all adopted mitigation measures are implemented during <br />project construction and operation and that potential environmental impacts are reduced <br />to less -than -significant levels. <br />An IS/MND was prepared for the Project in accordance with CEQA (Exhibit 6). The <br />IS/MND concluded that implementation of the proposed Project, and parking lot <br />improvements, could result in potentially significant environmental impacts; however, with <br />implementation of identified mitigation measures and compliance with applicable <br />conditions of approval, all impacts would be reduced to a less -than -significant level. The <br />City of Santa Ana is the Lead Agency for the Project pursuant to Section 15367 of the <br />CEQA Guidelines. <br />The MMRP prepared for the project, attached hereto as Exhibit 7, documents the <br />mitigation measures adopted for the Project, identifies the responsible parties, and <br />specifies the timing and method of implementation to ensure compliance during project <br />implementation. The MMRP does not address environmental topic areas that were <br />determined in the IS/MND to result in less -than -significant impacts for which no <br />mitigation was required. Based on the analysis contained in the IS/MND, adoption of the <br />MMRP will ensure that all applicable mitigation measures are implemented and that the <br />proposed Project will not result in significant environmental impacts. As such, a Notice <br />of Determination, Environmental Review No. 2025-119, will be filed for this project. <br />FISCAL IMPACT <br />There is no fiscal impact associated with these actions. <br />EXHIBIT(S) <br />1. Resolution Approving GPA No. 2025-01 <br />2. Ordinance Approving AA No. 2025-02 <br />