Laserfiche WebLink
CITY OF SANTA ANA <br /> Installer, Hardwood Floor <br /> Worker and acoustical <br /> installer...................$52.24 26.18 <br /> (2)Millwright............-$52.24 26.68 <br /> (3)Piled rivermen/Derrick <br /> Bargeman, Bridge or Dock <br /> Carpenter, Heavy Framer, <br /> Rock Bargeman or <br /> Scowman, <br /> Rockslinger, Shingler <br /> (Commercial). . . . . . . . . . . . . . . .$ 52.37 26.18 <br /> (4) Pneumatic Nailer, <br /> Power Stapler. . . . . . . . . . . . . . .$ 52.37 26.18 <br /> (5) Sawfiler. . . . .. . . . . . . . . .$ 52.34 26.18 <br /> (6) Scaffold Builder. . . . . . .$ 45.37 25.43 <br /> (7) Table Power Saw <br /> Operator. . . . . . . . . .. . . . . . . . . .$ 52.34 26.18 <br /> FOOTNOTE:Work of forming in the construction of open cut sewers or <br /> storm drains,on operations in which horizontal <br /> lagging is used in conjunction with steel H-Beams driven or placed in pre- <br /> drilled holes,for that portion of a lagged trench against which concrete is <br /> poured, namely, as a <br /> substitute for back forms(which work is performed by piledrivers): <br /> $0.13 per houradditional. <br /> -------------------------------------------------------------- <br />