My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16 - Agreement for the Waste Infrastructure System Enterprise
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
04/21/2026 Regular, Special HA
>
Item 16 - Agreement for the Waste Infrastructure System Enterprise
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2026 10:30:20 AM
Creation date
4/15/2026 9:24:49 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
16
Date
4/21/2026
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Attachment 1 <br /> <br />COUNTY OF ORANGE ORGANIC INFRASTRUCTURE <br /> <br />The County of Orange owns and operates a network of three commercial organic processing facilities co-located at <br />each of the active landfills. Each of the organic processing facilities have the ability to receive organic material and to <br />produce organic products for cities to meet their Take-Back requirements specified within this agreement. Products <br />produced at the organic processing facilities meet CalRecycle’s SB 1383 procurement requirement and are certified <br />under the US Composting Council’s Standard of Testing Assurance (STA) Program. Product offerings include <br />compost and composted mulch. Additional products may be offered as determined by the County. <br /> <br />A summary of each of the organic processing facilities is listed below: <br /> <br />Valencia Greenery (Co-Located at Olinda Alpha Landfill) <br />1942 N. Valencia Avenue <br />Brea, CA 92823 <br />Permitted Maximum Tonnage (Open Windrow): 94 tons per day <br />Proposed Permitted Maximum Tonnage (Covered Aerated Static Pile): 228 tons per day <br />Permitted Hours of Operation: Monday through Saturday 6:00 am to 4:00 pm <br />Ancillary Operation Hours: 24 hours per day/7 days a week <br /> <br />Bee Canyon Greenery (Co-Located at Frank R. Bowerman Landfill) <br />11002 Bee Canyon Access Road <br />Irvine, CA 92602 <br />Permitted Maximum Tonnage (Open Windrow): 210 tons per day <br />Proposed Permitted Maximum Tonnage (Covered Aerated Static Pile): 876 tons per day <br />Permitted Hours of Operation: Monday through Saturday 7:00 am to 5:00 pm <br />Ancillary Operation Hours: 24 hours per day/7 days a week <br /> <br />Capistrano Greenery (Co-Located at Prima Deshecha Landfill) <br />32250 Avenida La Pata <br />San Juan Capistrano, CA 92675 <br />Permitted Maximum Tonnage (Open Windrow): 204 tons per day <br />Proposed Permitted Maximum Tonnage (Covered Aerated Static Pile): 536 tons per day <br />Permitted Hours of Operation: Monday through Saturday 7:00 am to 5:00 pm <br />Ancillary Operation Hours: 24 hours per day/7 days a week <br /> <br />This list may be modified/expanded at the discretion of the County. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.