Laserfiche WebLink
Material And Force Account Estimate <br />Santa Ana <br />Estimate Number: 137226 Version: 2 <br />Standard Rates: Labor Additive = 223% <br />Estimate Good Until 10/24/25 <br />Location: SANTAANA IND LD, INDL, 519.08-519.12 <br />Description of Work: 761248L Warner Ave Santa Ana CA 519.1 Santa And Ind Ld <br />Prepared For: Santa Ana <br />Buy America: No <br />COMMENTS FACILITY Description QTY <br />UOM UCST <br />LABOR <br />MATERIAL <br />TOTAL <br />UP %0 <br />Agcy %100 <br />ENGINEERING <br />Engineering <br />1 <br />1 LS <br />81,135.00 <br />81,135 <br />0 <br />81,135 <br />0 <br />81,135 <br />Bill Prep Fee - Track Surface RECOLLECT <br />1 <br />LS <br />900.00 <br />0 <br />900 <br />900 <br />0 <br />900 <br />Homeline Freight - Track Surface RECOLLECT <br />1 <br />LS <br />900.00 <br />0 <br />900 <br />900 <br />0 <br />900 <br />Foreign Line Freight - Track Surface RECOLLECT <br />1 <br />LS <br />2,976.46 <br />0 <br />2,976 <br />2,976 <br />0 <br />2,976 <br />Sub -Total = <br />81,135 <br />4,776 <br />85,911 <br />0 <br />85,911 <br />TRACK CONSTRUCTION - COMPANY <br />Mobilization: Company <br />1 <br />DA <br />11,450.00 <br />11,450 <br />0 <br />11,450 <br />0 <br />11,450 <br />RDXING <br />RDXING 136# CON10W PP PAN COMPLETE <br />224 <br />TF <br />981.01 <br />120,314 <br />99,431 <br />219,745 <br />0 <br />219,745 <br />TRACK <br />136#CWRIS024-8'6"PPHWDN16TP <br />96 <br />TF <br />854.06 <br />61,030 <br />20,959 <br />81,989 <br />0 <br />81,989 <br />COMPJT <br />Transition Rail - 136# <br />4 <br />PR <br />7,694.04 <br />16,259 <br />14,517 <br />30,776 <br />0 <br />30,776 <br />Sub -Total = <br />209,053 <br />134,908 <br />343,961 <br />0 <br />343,961 <br />TRACK REMOVAL - COMPANY <br />RDXING <br />Remove road crossing - concrete <br />180 <br />1 TF <br />100.73 <br />18,132 <br />0 <br />18,132 <br />0 <br />18,132 <br />TRACK <br />Remove Track <br />1140 <br />1 TF <br />44.971 <br />6,2951 <br />01 <br />6,2951 <br />01 <br />6,295 <br />Sub -Total = <br />24,427 <br />0 <br />24,427 <br />0 <br />24,427 <br />SITE WORK - CONTRACT <br />Asphalt: Saw Cut 1 1 <br />1 LS 1 2,500.00 <br />0 <br />2,500 <br />2,500 <br />0 <br />2,500 <br />Sub -Total = <br />0 <br />2,500 <br />2,500 <br />0 <br />2,500 <br />EQUIPMENT RENTAL <br />Equipment Rental 5 <br />1 LS 1 5,000.00 <br />0 <br />25,000 <br />25,000 <br />0 <br />25,000 <br />Sub -Total = <br />0 <br />25,000 <br />25,000 <br />0 <br />25,000 <br />Total Wgt. in Tons = 1,413 <br />Totals = <br />314,615 <br />167,184 <br />481,799 <br />0 <br />481,799 <br />Grand Total = <br />$481,799 <br />Please Note: The above figures are estimates only and are subject to fluctuation. In the event of an <br />increase or decrease in the cost or amount of material or labor required, Santa Ana will <br />pay actual <br />construction costs at the current rates effective thereof. <br />EXHIBIT 2 <br />Thursday, April 24, 2025 Page 1 of 1 <br />