<br />CAPITAL IMPROVEMENT PROJECT WORKSHEET
<br />PROJECT TITLE:PROJECT DESCRIPTION:PROJECT NEED:
<br />Industrial Street Repair Program This project entails the rehabilitation of existing roadway pavement
<br />for industrial streets. The project will include the removal and
<br />replacement of existing asphalt streets. Various replacement
<br />pavement strategies will be investigated to determine the most cost
<br />effective and maintainable treatment. Minor concrete repair to
<br />severely damaged or missing curbs, gutters, sidewalks, and
<br />wheelchair ramps will also be included.
<br />The interior roadway of non-residential street has been identified as
<br />priority by the City's Pavement Management System. The pavement is
<br />deteriorating due to weather, age, and heavy usage.PROJECT CATEGORY:
<br />Street Improvements
<br />Arterial Street Rehabilitation
<br />LOCATION MAP
<br />PROJECT COSTS
<br />Construction
<br />FY 23/24
<br />2,166,480
<br />240,720
<br />FY 24/25
<br />2,166,480
<br />240,720
<br />FY 25/26
<br />2,166,480
<br />240,720
<br />FY 26/27
<br />2,166,480
<br />240,720
<br />FY 27/28
<br />2,166,480
<br />240,720
<br />FY 28/29
<br />2,166,480
<br />240,720
<br />FY 29/30
<br />2,166,480
<br />240,720Engineering
<br />TOTAL 2,407,200 2,407,200 2,407,200 2,407,200 2,407,200 2,407,200 2,407,200
<br />SOURCE OF FUNDS FY 23/24
<br />-
<br />FY 24/25
<br />-
<br />FY 25/26
<br />-
<br />FY 26/27
<br />-
<br />FY 27/28
<br />-
<br />FY 28/29
<br />-
<br />FY 29/30
<br />-
<br />PAVMNT ACCELRTD REPAIR
<br />IM
<br />2,407,200 2,407,200 2,407,200 2,407,200 2,407,200 2,407,200 2,407,200
<br />REFUSE MAINTENANCE -------
<br />TOTAL 2,407,200 2,407,200 2,407,200 2,407,200 2,407,200 2,407,200 2,407,200
<br />AGENCY:DIVISION:CONTACT:
<br />Public Works CIP Engineering Jason Gabriel, Principal Civil Engineer