Laserfiche WebLink
<br />CITY OF SANTA ANA FY 23/24CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT TITLE:PROJECT DESCRIPTION:PROJECT NEED: <br />Industrial Street Repair Program This project entails the rehabilitation of existing roadway pavement <br />for industrial streets. The project will include the removal and <br />replacement of existing asphalt streets. Various replacement <br />pavement strategies will be investigated to determine the most cost <br />effective and maintainable treatment. Minor concrete repair to <br />severely damaged or missing curbs, gutters, sidewalks, and <br />wheelchair ramps will also be included. <br />The interior roadway of non-residential street has been identified as <br />priority by the City's Pavement Management System. The pavement is <br />deteriorating due to weather, age, and heavy usage.PROJECT CATEGORY: <br />Street Improvements <br />Arterial Street Rehabilitation <br />LOCATION MAP <br />PROJECT COSTS <br />Construction <br />FY 23/24 <br />2,166,480 <br />240,720 <br />FY 24/25 <br />2,166,480 <br />240,720 <br />FY 25/26 <br />2,166,480 <br />240,720 <br />FY 26/27 <br />2,166,480 <br />240,720 <br />FY 27/28 <br />2,166,480 <br />240,720 <br />FY 28/29 <br />2,166,480 <br />240,720 <br />FY 29/30 <br />2,166,480 <br />240,720Engineering <br />TOTAL 2,407,200 2,407,200 2,407,200 2,407,200 2,407,200 2,407,200 2,407,200 <br />SOURCE OF FUNDS FY 23/24 <br />- <br />FY 24/25 <br />- <br />FY 25/26 <br />- <br />FY 26/27 <br />- <br />FY 27/28 <br />- <br />FY 28/29 <br />- <br />FY 29/30 <br />- <br />PAVMNT ACCELRTD REPAIR <br />IM <br />2,407,200 2,407,200 2,407,200 2,407,200 2,407,200 2,407,200 2,407,200 <br />REFUSE MAINTENANCE ------- <br />TOTAL 2,407,200 2,407,200 2,407,200 2,407,200 2,407,200 2,407,200 2,407,200 <br />AGENCY:DIVISION:CONTACT: <br />Public Works CIP Engineering Jason Gabriel, Principal Civil Engineer <br />26