My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 - Award a Construction Contract for the Warner Avenue Improvements
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
04/21/2026 Regular, Special HA
>
Item 20 - Award a Construction Contract for the Warner Avenue Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2026 10:29:54 AM
Creation date
4/15/2026 9:32:19 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20
Date
4/21/2026
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA ADDENDUM No. THREE <br />PROPOSAL Project 18-6901 <br />PROJECT NOS.: 18-6901, 20-6971, 23-6628 <br />WARNER AVENUE IMPROVEMENTS PHASE 2A (OAK ST TO GRAND AVE) <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />133 <br />8" Class 305 (DR 14), AWWA <br />LF <br />470 <br />C900, PVC Water Main* <br />134 <br />12" Class 305 (DR 14), AWWA <br />LF <br />700 <br />$� -- <br />$ ���• <br />C900, PVC Water Main* <br />' <br />135 <br />20" Class 235 (DR 18), AWWA <br />LF <br />20 <br />$0.'- <br />$�O_ -- <br />C905, PVC Water Main* <br />136 <br />2" Copper Water Service Per City <br />EA <br />4 <br />$0 <br />0`_ <br />$ <br />Std Plan 1402* <br />137 <br />4" Water Service per City Std Plan <br />EA <br />2 <br />$�O — <br />$ ;4_0 Oco <br />1403B / 1403D* <br />' <br />138 <br />6" Fire Service per City Std. Plan <br />EA <br />1 <br />$4C'CCDr <br />$ 45COO �-- <br />1417* <br />12" Fire Service per City Std. Plan <br />LS <br />1 <br />$ so' coo <br />139 <br />1417 (Re -configure Existing Fire <br />80 �. '- <br />Protection Backflow Assembly at <br />1224 E. Warner Avenue)* <br />140 <br />12" Gate Valve per City Std. Plan <br />EA <br />5 <br />$ <br />$O <br />1410*�` <br />141 <br />20" Butterfly Valve per City Std. <br />*142 <br />EA <br />1 <br />$ l`���'w <br />-� <br />$ <br />Plan 1411 <br />20" Line Stop* <br />EA <br />2 <br />143 <br />Fire Hydrant Assembly per City <br />EA <br />3 <br />_ <br />Std. Plan 1405* <br />144 <br />Abandon Existing Water Service <br />EA <br />3 <br />$ 000 <br />per City St. Plan 1430* <br />145 <br />CCTV Inspection of Existing Sewer <br />LF <br />700 <br />$ r <br />$, -_ <br />Main* <br />146 <br />CCTV Inspection of Existing Sewer <br />EA <br />8 <br />$ <br />` _ <br />$ <br />Laterals* <br />-147 <br />Vertical Offset (As -Needed)* <br />EA <br />5 <br />148 <br />Potholing (As -Needed)* <br />EA <br />5 <br />$ !I:` C F .--. <br />$ <br />P-8 of P-29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.