My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 - Award a Construction Contract for the Warner Avenue Improvements
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
04/21/2026 Regular, Special HA
>
Item 20 - Award a Construction Contract for the Warner Avenue Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2026 10:29:54 AM
Creation date
4/15/2026 9:32:19 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20
Date
4/21/2026
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 4 <br />acquisitions, and an increase of 4 partial acquisitions, compared to the proposed project. <br />Facts in Support of Finding: <br />■ This alternative would achieve all project objectives. <br />■ This alternative would reduce the number of residential parcels that would be affected by <br />construction noise; however, this impact would remain significant and unavoidable in this <br />alternative, as it would for the proposed project. <br />■ The 110 South Alternative would reduce environmental impacts to population and <br />housing; all other environmental topics would be similar to the proposed project. <br />■ This alternative would result in the loss of a strip of property along the north side of <br />James Monroe EIementary School, National Guard Armory, and Delhi Park and the <br />demolition of Cherry Aerospace, a large industrial parcel that provides the community <br />with income and employment opportunities. While fewer homes would be demolished <br />under this alternative, the demolition of Cherry Aerospace would not be an economically <br />feasible substitute. Additionally, the impact to public facilities would have greater effects <br />to the community compared to the proposed project. <br />■ Land use and planning impacts would be greater than the proposed project. <br />Finding: The City of Santa Ana finds, based on the Final EIR and the whole of the record, that <br />the 110 South Alternative is less desirable than the proposed project. Specific economic, legal, <br />social, technological, or other considerations, including considerations for the provision of <br />employment opportunities for highly trained workers, make this alternative less than desirable <br />than the proposed project. Public Resources Code § 21081 [a] [3], Guidelines § 15091 [a] [3]). <br />C. 120 South Alternative <br />This alternative would use a 120-foot total ROW width, the City of Santa Ana standard Major <br />Arterial ROW, and would align most of the road widening to the south of the existing centerline. <br />The ROW includes six 12-foot lanes, a 14-foot-wide raised landscaped median, 7-foot <br />shoulder/bike lanes, and 10-foot parkway and sidewalk. This alternative would require 31 full and <br />25 partial parcel acquisitions. <br />Compared to the proposed project, the major differences with this alignment are the acquisition <br />and building removal of three additional commercial parcels (at the strip commercial center), the <br />fire station, and two industrial parcels (Cherry Aerospace and H&H asphalt). The majority of <br />impacts to full residential parcels would be shifted from the north to the south side of Warner <br />Avenue and result in the reduction of 4 full acquisitions. <br />Facts in Support of Finding: <br />■ This alternative would result in the loss of a significant strip of property along Warner <br />Avenue at the Monroe Elementary School, National Guard Armory, and Delhi Park. <br />■ This alternative would not reduce cither of the significant and unavoidable impacts of the <br />proposed project, and would increase environmental impacts to air quality, greenhouse <br />gas emissions, and hazards and hazardous materials. Long tern traffic noise impacts <br />may be reduced. All other environmental topics would be similar to the proposed project. <br />CEQA Findings of Fact - 15 - <br />Warner Avenue Improvements & Widening from Main Street to Grand Avenue Aug 2015 <br />75B-27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.