My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 - Award a Construction Contract for the Warner Avenue Improvements
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
04/21/2026 Regular, Special HA
>
Item 20 - Award a Construction Contract for the Warner Avenue Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2026 10:29:54 AM
Creation date
4/15/2026 9:32:19 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20
Date
4/21/2026
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 4 <br />1. Introduction <br />1.3 PROJECT DESCRIPTION <br />The project would improve and widen Warner Avenue from Main Street to Grand Avenue, from the existing <br />variable ROW to a consistent 110-foot ROW. Warner Avenue would have six traffic lanes, raised landscaped <br />median, bike lanes, parkways, and sidewalks. The project would also include replacement of existing storm drains <br />with larger storm drains, and the undergrounding of existing utilities along the project segment. The project requires <br />City acquisition of 35 full parcels and a portion of 27 parcels (based on assessor parcel number). Note that multiple <br />APN's comprise some single properties and that one property may have multiple businesses or addresses. Based on <br />Draft Relocation Impact Statement (property ownership records) the total acquisition would be 34 full and 22 partial <br />properties. . <br />1.4 ENVIRONMENTAL IMPACTS <br />1.4.1 Impacts Considered Less Than Significant <br />The following environmental topics were determined to have less than significant impacts. Impacts to topics marked <br />with an asterisk (*) were analyzed in the Initial Study; the remainder were analyzed in the EIwR.. <br />• Aesthetics* <br />• Agriculture and Forestry Resources* <br />• Biological Resources* <br />• Geology and Soils <br />• Greenhouse Gas Emissions <br />• Hazards and Hazardous Materials <br />• IIydrology and Water Quality <br />• Land Use and Planning <br />• Mineral Resources* <br />• Population and Housing <br />• Public Services* <br />• Recreation* <br />• Utilities and Service Systems <br />1.4.2 Potentially Significant Adverse Impacts That Can Be Mitigated, Avoided, or Stcbstantially Lessened <br />Air quality and cultural resources were determined to have less than significant impacts after implementation of <br />required mitigation measures. <br />1.4.3 Unavoidable Significant Adverse Impacts <br />The following topics would remain significant and unavoidable even after implementation of required mitigation: <br />• Noise (during construction) <br />• Transportation and Traffic (during construction) <br />Page 2 • PlaceWorks <br />August 2015 <br />75B-41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.