My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 - Award a Construction Contract for the Warner Avenue Improvements
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
04/21/2026 Regular, Special HA
>
Item 20 - Award a Construction Contract for the Warner Avenue Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2026 10:29:54 AM
Creation date
4/15/2026 9:32:19 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20
Date
4/21/2026
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 4 <br />NEPA/CEQA RE -VALIDATION FORM <br />CEQA CONCLUSION (Only mandated for projects on the State Highway System.) <br />Based on an examination of the changed conditions and supporting information, the following <br />conclusion has been reached regarding appropriate CEQA documentation: (Check ONE of the <br />five statements below, indicating whether any additional documentation is or will be prepared, <br />and if so, what kind. If additional documentation is prepared, attach a copy of this signed form <br />and any continuation sheets.) <br />❑ Original document remains valid. No further documentation is necessary but may be <br />included on continuation sheets. <br />❑ An Addendum was prepared for minor technical changes or additions to the project <br />and is: <br />❑ included on the continuation sheets or <br />❑ attached. <br />It need not be circulated for public review (CEQA Guidelines, §15164). The <br />addendum must include a brief explanation of why the decision was made to not <br />prepare a subsequent or supplemental environmental document as well as a <br />summary statement explaining the changes to the project. <br />❑ Changes are substantial, but only minor additions or changes are necessary to make <br />the previous document adequate. A Supplemental environmental document will be <br />prepared, and it will be circulated for public review (CEQA Guidelines, §15163). <br />❑ Changes are substantial, and major revisions to the current document are necessary. <br />A Subsequent environmental document will be prepared, and it will be circulated for <br />public review (CEQA Guidelines, §15162). <br />(Specify type of subsequent document, e.g., Subsequent FEIR): <br />❑ The CE is no longer valid. New CE is needed. ❑ Yes ❑ No <br />CONCURRENCE WITH CEQA CONCLUSION <br />I concur with the CEQA conclusion above. <br />N/A <br />Signature: Environmental Branch Chief Date <br />N/A <br />Signature: Project Manager/DLAE <br />Date <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.