My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 - Award a Construction Contract for the Warner Avenue Improvements
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
04/21/2026 Regular, Special HA
>
Item 20 - Award a Construction Contract for the Warner Avenue Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2026 10:29:54 AM
Creation date
4/15/2026 9:32:19 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20
Date
4/21/2026
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 5 <br />PROJECT TITLE: <br />Warner Ave Impr. Ph 2 - Oak - Grand <br />PROJECT CATEGORY: <br />Street Improvements <br />Street/Bridge Improvements & Widening <br />LOCATION MAP <br />CITY OF SANTA ANA FY 25/26CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />This project will widen Warner Avenue between Oak Street and Grand <br />Avenue from 2 to 3 lanes in each direction. The project will also include <br />additional left turn lanes at Grand Avenue, bus pads, raised medians, and <br />a protected bike lane. <br />a <br />PROJECT NEED: <br />The MPAH (Master Plan of Arterial Highways) Strategic Plan Technical <br />Report identified the need for Warner Avenue to be widened to a six -lane <br />major arterial to meet MPAH requirements. The existing Average Daily Traffic <br />(ADT) is in excess of 29,600 vehicles per day. The proposed improvements <br />will allow the segment to accommodate future traffic volumes at a Level of <br />Service A and increase operational efficiency. <br />PROJECT COSTS <br />FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 FY 31/32 <br />Construction <br />19,390,033 - - - - - - <br />TOTAL <br />19,390,033 - - - - - - <br />M <br />SOURCE OF FUNDS <br />FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 FY 31/32 <br />SELECT STREET <br />1,332,131 - <br />MEASURE M2 COMPETITIVE <br />_ _ _ _ _ <br />11,997,205 <br />TRANSP SYS IMP AUTHORITY <br />5,709,239 <br />TSIA AREA E <br />298,019 <br />TSIA AREA F <br />53,439 <br />TOTAL <br />19,390,033 <br />AGENCY: DIVISION: CONTACT: DATE: <br />Public Works C/P Engineering Alex Bangean, Senior Civil Engineer 06-Apr-2026 <br />
The URL can be used to link to this page
Your browser does not support the video tag.