Laserfiche WebLink
CITY Of SANTA ANA <br />a?ucac?cx <br />roNmACra4?aa?4 <br />RgelNads PROJECTN0.07.2503-SR551MacNihurBoulevard Ramps tlag¢(tdaNmha <br />Wdeninp 1 <br />To Petersoo-CtaseGeneral EnOineeringConsWdionINC. <br />CCdrada <br />ad <br />rrnEMSO*EasermruraTaaMumLrarHanMGRanMa4+a <br />Ulasa}sn 9dtd rNretl daggnelmaafysrA4rea,eppm 'saaeyLw adroAm val6aadhideare. <br /> <br />1. REVISED QUM71ES ON UNIT-PRICED WORK ITEMS <br />R?hd <br />Ilenlp (MHra35d llran Iha rn?rlnIrw aro n,,. <br />6 TemporaryTraficStripe?Painl) lF 9,610 $0.26 $2,566.20 <br />9 TreO?cPlaslkDNm EA 267 $50.00 $14,350.00 <br />11 TempaayRailk?gRypeK? LF 4,427 $f1.S0 $W,910.50 <br />16 Remmre Melal Beam Guard Railing LF 280 E10.0o 82,900.00 <br />17 RemoveRoadside$ign FA 6 $100,00 $600.00 <br />2S RelocaleRaadsitle$igmOnePcst FA 1 $15000 $1,OS0.00 <br />33 RcadwayEvcavalion CY 4,737 $23.00 $106,951.00 <br />34 SWdurel E¢cavalian CV 140 $21.00 $2,94000 <br />35 StruclurelBackfll CY 90 $25.00 $2,250.00 <br />36 TampareryFibarRoll LF 1,620 $2.W $3,240.00 <br />39 ?aat?GroupF? FA 554 $1,00 $554.00 <br />40 PIanl?GrouPH) FA 0 $140 50.00 <br />40 Class2AggragateSu6bas¢ CY 1,130 52500 $43,2SO.W <br />4S Class2gggregateBase CY 1,474 535.00 $51,590D0 <br />46 AsphaHTrealadPemteableBase CV 0 $143.00 $0,00 <br />47 HoIM'pAsphalt?TypeB) TON 0 $65.00 $6.99 <br />46 RubberuedRolMiaAsphalt?GapGrad¢tl) TON 1,308 $100.00 $130,800.00 <br />49 Race Asphalt Concrete 01ka ?Typa 0? LF 1,411 $6.00 $6,466.00 <br />50 StruclurelCoacrele CY 50 $240,00 $12,000AO <br />53 BarRaialommgSteal LB 11,106 $1,00 $11,106A0 <br /> <br /> <br /> <br /> <br /> <br />4 <br /> <br /> <br /> <br /> <br />umrshSlgaSWdure?Truss? <br /> <br /> <br /> <br /> <br />B <br /> <br /> <br /> <br /> <br />S,S90 <br /> <br /> <br /> <br /> <br />300 YOU ae ham/darrA londa as rOM degxhm tl¢ p'as at yeoptos am de Mawirg dmiad Wk rd ixwdel inae on <br />Wkaoasmrsmtal <br />O"MAO PUBUC WORKS AGENCY <br />The contract shall be modified per City of Santa Ma PCO Nos,1 and 2 dated November 30, 2010 and <br />December 30, 2010, respectively and the centred bid We shall be modfied as follows: <br />$106,710.110 <br />Page 1 of 4