• 0
<br />Exhibit 1
<br />CONTRACT CURRRENT
<br />SITE ALLOWANCE
<br />SOV
<br />BUDGET
<br />DEMOLITION, SHORING, EARTHWORK & GRADING
<br />$648,490
<br />$257,878
<br />SITE UTILITIES
<br />$221,750
<br />$245,800
<br />ASPHALT PAVING
<br />$108,378
<br />$8,000
<br />LANDSCAPE, IRRIGATION
<br />$92,900
<br />$750
<br />SITE CONCRETE
<br />$59,720
<br />$0
<br />SITE ELECTRICAL
<br />$160,750
<br />$397,250
<br />SUBTOTAL SITE ALLOWANCE $1,291,988 $909,678
<br />PARKING STRUCTURE
<br />CRACK CONTROL ALLOWANCE
<br />$2,500
<br />$0
<br />FIELD ENGINEERING
<br />$6,000
<br />$0
<br />SECURITY FENCING OUTSIDE GARAGE FOOTPRINT
<br />EXCLUDED
<br />EXCLUDED
<br />EXCAVATION & BACKFILL
<br />$58,233
<br />$60,000
<br />PILES - DRIVEN/ POURED
<br />EXCLUDED
<br />EXCLUDED
<br />SITE CONCRETE / STAIRS
<br />$33,000
<br />$0
<br />PARKING LOT STRIPING / BUMPERS
<br />$7,500
<br />$10,000
<br />REINFORCING STEEL & PT
<br />$500,614
<br />$822,000
<br />BARRIER CABLE
<br />$25,475
<br />$25,000
<br />CONCRETE FORM
<br />$1,440,708
<br />$1,444,990
<br />MASONRY
<br />$72,908
<br />$332,604
<br />STEEL MISCELLANEOUS
<br />$274,337
<br />$177,923
<br />SHEET METAL
<br />$3,784
<br />$7,000
<br />CAULKING & BGWP
<br />$7,642
<br />$18,000
<br />METAL DOORS / FRAMES / HARDWARE
<br />$3,100
<br />$10,000
<br />OVERHEAD DOORS
<br />$10,000
<br />$60,000
<br />GLASS & GLAZING
<br />$7,200
<br />$15,800
<br />LATH & PLASTER
<br />$39,278
<br />$106,000
<br />CERAMIC TILE
<br />$4,200
<br />$5,000
<br />PAINTING
<br />$17,840
<br />$101,000
<br />SIGNS & GRAPHICS
<br />$3,200
<br />$10,000
<br />TOILET PARTITIONS / ACCESSORIES
<br />N/A
<br />N/A
<br />SPECIALTIES & EQUIPMENT
<br />N/A
<br />N/A
<br />PARKING CONTROLS (ALLOWANCE)
<br />$30,000
<br />$826,336
<br />ELEVATORS
<br />$58,539
<br />$50,000
<br />FIRE SPRINKLER SYSTEM / EXTINGUISHERS
<br />$38,300
<br />$54,000
<br />PLUMBING
<br />$86,170
<br />$85,000
<br />HVAC
<br />$5,135
<br />$5,000
<br />ELECTRICAL
<br />$164,478
<br />$242,750
<br />FINAL CLEAN -UP
<br />$4,923
<br />$24,196
<br />TEMP POWER
<br />$10,000
<br />$10,000
<br />CONTINGENCY
<br />$200,000
<br />$100,000
<br />SUBCONTRACTORS FEE & GENERAL CONDITIONS
<br />$356,089
<br />$374,452
<br />SUBTOTAL PARKING STRUCTURE
<br />$3,471,153
<br />$4,977,051
<br />NEW WORK
<br />SITE PACKAGE (INCL. PAVING / LANDSCAPE/ PAD) $0 $1,389,944
<br />SUBTOTAL NEW WORK $0 $1,389,944
<br />Page 1
<br />
|