Laserfiche WebLink
• 0 <br />Exhibit 1 <br />CONTRACT CURRRENT <br />SITE ALLOWANCE <br />SOV <br />BUDGET <br />DEMOLITION, SHORING, EARTHWORK & GRADING <br />$648,490 <br />$257,878 <br />SITE UTILITIES <br />$221,750 <br />$245,800 <br />ASPHALT PAVING <br />$108,378 <br />$8,000 <br />LANDSCAPE, IRRIGATION <br />$92,900 <br />$750 <br />SITE CONCRETE <br />$59,720 <br />$0 <br />SITE ELECTRICAL <br />$160,750 <br />$397,250 <br />SUBTOTAL SITE ALLOWANCE $1,291,988 $909,678 <br />PARKING STRUCTURE <br />CRACK CONTROL ALLOWANCE <br />$2,500 <br />$0 <br />FIELD ENGINEERING <br />$6,000 <br />$0 <br />SECURITY FENCING OUTSIDE GARAGE FOOTPRINT <br />EXCLUDED <br />EXCLUDED <br />EXCAVATION & BACKFILL <br />$58,233 <br />$60,000 <br />PILES - DRIVEN/ POURED <br />EXCLUDED <br />EXCLUDED <br />SITE CONCRETE / STAIRS <br />$33,000 <br />$0 <br />PARKING LOT STRIPING / BUMPERS <br />$7,500 <br />$10,000 <br />REINFORCING STEEL & PT <br />$500,614 <br />$822,000 <br />BARRIER CABLE <br />$25,475 <br />$25,000 <br />CONCRETE FORM <br />$1,440,708 <br />$1,444,990 <br />MASONRY <br />$72,908 <br />$332,604 <br />STEEL MISCELLANEOUS <br />$274,337 <br />$177,923 <br />SHEET METAL <br />$3,784 <br />$7,000 <br />CAULKING & BGWP <br />$7,642 <br />$18,000 <br />METAL DOORS / FRAMES / HARDWARE <br />$3,100 <br />$10,000 <br />OVERHEAD DOORS <br />$10,000 <br />$60,000 <br />GLASS & GLAZING <br />$7,200 <br />$15,800 <br />LATH & PLASTER <br />$39,278 <br />$106,000 <br />CERAMIC TILE <br />$4,200 <br />$5,000 <br />PAINTING <br />$17,840 <br />$101,000 <br />SIGNS & GRAPHICS <br />$3,200 <br />$10,000 <br />TOILET PARTITIONS / ACCESSORIES <br />N/A <br />N/A <br />SPECIALTIES & EQUIPMENT <br />N/A <br />N/A <br />PARKING CONTROLS (ALLOWANCE) <br />$30,000 <br />$826,336 <br />ELEVATORS <br />$58,539 <br />$50,000 <br />FIRE SPRINKLER SYSTEM / EXTINGUISHERS <br />$38,300 <br />$54,000 <br />PLUMBING <br />$86,170 <br />$85,000 <br />HVAC <br />$5,135 <br />$5,000 <br />ELECTRICAL <br />$164,478 <br />$242,750 <br />FINAL CLEAN -UP <br />$4,923 <br />$24,196 <br />TEMP POWER <br />$10,000 <br />$10,000 <br />CONTINGENCY <br />$200,000 <br />$100,000 <br />SUBCONTRACTORS FEE & GENERAL CONDITIONS <br />$356,089 <br />$374,452 <br />SUBTOTAL PARKING STRUCTURE <br />$3,471,153 <br />$4,977,051 <br />NEW WORK <br />SITE PACKAGE (INCL. PAVING / LANDSCAPE/ PAD) $0 $1,389,944 <br />SUBTOTAL NEW WORK $0 $1,389,944 <br />Page 1 <br />