|
. SOLUTION5,1NO
<br /> Due Diligence I Entitlement I Environmental _. Policy
<br /> SNUG HARBOR SURF PARK, CITY written comments, coordinated with that the project's environmental
<br /> City staff, and provided redline impacts were fully disclosed and
<br /> Terrance provided senior oversight revisions to strengthen the mitigated where necessary. He
<br /> and QAfQC for the EID that EPD's Addendum's legal defensibility under provided strategic feedback and
<br /> team prepared for the Snug Harbor CEQA Guidelines Section 15164. written edits to improve the
<br /> Surf Park, a proposed recreational DISCOVERY PARK RESIDENTIAL Addendum's clarity, consistency, and
<br /> facility in Newport Beach. His PROJECT,CEQA SECTION 15183 legal robustness.
<br /> responsibilities include overseeing PEER REVIEW,CITY OF IRVINE
<br /> technical studies, public agency Terrance served as the lead reviewer VON KARMAN CREATIVE
<br /> coordination, and preparation of the for the City of Irvine's CEQA peer CAMPUS(VKCC)RESIDENTIAL
<br /> Draft and Final Environmental Impact review of the 15183 Consistency PROJECT, CEQA SECTION 15183
<br /> Report(EIR)to assess impacts such Justification for the Discovery Park PEER REVIEW, CITY OF IRVINE
<br /> as water use, traffic, and community project, a proposed 1,858-unit Terrance served as the lead reviewer
<br /> character and respond to a variety of residential development within for the CEQA 15183 Consistency
<br /> public comments made on this highly Planning Area 31. He oversaw the Justification for the Von Karman
<br /> controversial project that was technical review of supporting Creative Campus(VKCC)Residential
<br /> approved in October 2025. documents, including air quality and Project in Planning Area 1 of the City
<br /> GHG emissions, health risk of Irvine. He oversaw the review of all
<br /> 1500 QUAIL STREET assessment, and biological supporting technical studies and
<br /> RESIDENTIAL PROJECT, CITY OF resources, ensuring that the project's personally conducted the review of
<br /> NEWPORT BEACH impacts were fully addressed within the project's noise analysis. His
<br /> Terrance is preparing CEQA the framework of the City's General evaluation ensured that the
<br /> documentation for a residential Plan EIR. His responsibilities exemption was fully supported by
<br /> redevelopment project under SB 330 included verifying that the exemption evidence showing no new or more
<br /> and streamlining provisions. His work was appropriately supported, severe environmental impacts
<br /> includes verifying project eligibility, confirming that no new or more beyond those analyzed in the City's
<br /> assessing consistency with existing severe impacts would occur, and General Plan EIR.Terrance verified
<br /> planning policies, and facilitating ensuring consistency between the that the project was consistent with
<br /> entitlement review under an infill justification, technical studies, and adopted mitigation measures and
<br /> exemption framework, project plans, development policies, and he
<br /> prepared detailed comments to
<br /> PA 51 TRAILS AND TRANSIT- PA 25 RESIDENTIAL PROJECT, ensure the exemption met CEQA
<br /> ORIENTED DEVELOPMENT, ADDENDUM PEER REVIEW, CITY requirements for streamlined review.
<br /> ADDENDUM PEER REVIEW, CITY OF IRVINE
<br /> OF IRVINE Terrance led the peer review of the SILVER STRAND ELEMENTARY
<br /> Terrance served as the lead reviewer CEQA Addendum for the PA 25 SCHOOL RENOVATION, NAVAL
<br /> for the City of Irvine's CEQA peer Residential Project in the City of BASE CORONADO
<br /> review of the Addendum to the 2012 Irvine,which proposed the Terrance served as the project
<br /> Subsequent Supplemental EIR for development of up to 2,500 planner for the renovation of Silver
<br /> the PA 51 Trails and Transit-Oriented
<br /> Development project.Acting on residential units within the University Strand Elementary School, a public
<br /> Research Center. He oversaw the K 6 school located on Navy-owned
<br /> behalf of the City, he oversaw the
<br /> review of technical studies including review of technical studies property at Naval Base Coronado. In
<br /> air quality, greenhouse gas addressing air quality, GHG this role, he led all planning activities
<br /> emissions, noise, and lighting, emissions, biological resources, necessary to support the
<br /> ensuring consistency with CEQA geotechnical conditions, hydrology, modernization of the aging school
<br /> requirements and the City's water quality, and site contamination. facilities, including site planning,
<br /> environmental policies. He evaluated Terrance ensured that the Addendum coordination with installation
<br /> the Addendum for proper tiering, properly tiered from the City's 2045 command, and alignment with both
<br /> legal adequacy, and internal General Plan EIR in accordance with Navy and Department of Defense
<br /> consistency with the prior certified CEQA Guidelines Section 15164, and Education Activity standards.
<br /> EIR. Terrance also prepared detailed
<br /> www.epdsolutions.com 3333 Michelson Drive,Suite 500, Irvine,CA 92612 1 949-794-1180 Page 2 of 5
<br />
|