Laserfiche WebLink
. SOLUTIONS,INC <br /> Due Diligence I Entitlement I Environmental Planning I Development <br /> SNUG HARBOR SURF PARK, CITY written comments, coordinated with that the project's environmental <br /> OF NEWPORT BEACH City staff, and provided redline impacts were fully disclosed and <br /> Terrance provided senior oversight revisions to strengthen the mitigated where necessary. He <br /> and QAIQC for the EID that EPD's Addendum's legal defensibility under provided strategic feedback and <br /> team prepared for the Snug Harbor CEQA Guidelines Section 15164. written edits to improve the <br /> Surf Park, a proposed recreational DISCOVERY PARK RESIDENTIAL Addendum's clarity,consistency, and <br /> facility in Newport Beach. His PROJECT,CEQA SECTION 15183 legal robustness. <br /> responsibilities include overseeing PEER REVIEW, CITY OF IRVINE <br /> technical studies, public agency Terrance served as the lead reviewer VON KARMAN CREATIVE <br /> coordination, and preparation of the for the City of Irvine's CEQA peer CAMPUS (VKCC)RESIDENTIAL <br /> Draft and Final Environmental Impact review of the 15183 Consistency PROJECT, CEQA SECTION 16183 <br /> Report(EIR)to assess impacts such Justification for the Discovery Park PEER REVIEW, CITY OF IRVINE <br /> as water use, traffic, and community project, a proposed 1,858-unit Terrance served as the lead reviewer <br /> character and respond to a variety of residential development within for the CEQA 15183 Consistency <br /> public comments made on this highly Planning Area 31. He oversaw the Justification for the Von Korman <br /> controversial project that was technical review of supporting Creative Campus(VKCC)Residential <br /> approved in October 2025. documents, including air quality and Project in Planning Area 1 of the City <br /> GHG emissions, health risk of Irvine. He oversaw the review of all <br /> 1500 QUAIL STREET assessment, and biological supporting technical studies and <br /> RESIDENTIAL PROJECT, CITY OF resources, ensuring that the project's personally conducted the review of <br /> NEWPORT BEACH impacts were fully addressed within the project's noise analysis. His <br /> Terrance is preparing CEQA the framework of the City's General evaluation ensured that the <br /> documentation for a residential Plan EIR. His responsibilities exemption was fully supported by <br /> redevelopment project under SB 330 included verifying that the exemption evidence showing no new or more <br /> and streamlining provisions. His work was appropriately supported, severe environmental impacts <br /> includes verifying project eligibility, confirming that no new or more beyond those analyzed in the City's <br /> assessing consistency with existing severe impacts would occur,and General Plan EIR.Terrance verified <br /> planning policies, and facilitating ensuring consistency between the that the project was consistent with <br /> entitlement review under an infill justification, technical studies,and adopted mitigation measures and <br /> exemption framework. project plans. development policies, and he <br /> prepared detailed comments to <br /> PA 51 TRAILS AND TRANSIT- PA 25 RESIDENTIAL PROJECT, ensure the exemption met CEQA <br /> ORIENTED DEVELOPMENT, ADDENDUM PEER REVIEW, CITY requirements for streamlined review. <br /> ADDENDUM PEER REVIEW, CITY OF IRVINE <br /> OF IRVINE Terrance led the peer review of the SILVER STRAND ELEMENTARY <br /> Terrance served as the lead reviewer CEQA Addendum for the PA 25 SCHOOL RENOVATION, NAVAL <br /> for the City of Irvine's CEQA peer Residential Project in the City of BASE CORONADO <br /> review of the Addendum to the 2012 Irvine, which proposed the Terrance served as the project <br /> Subsequent Supplemental EIR for development of up to 2,500 planner for the renovation of Silver <br /> the PA 51 Trails and Transit-Oriented Strand Elementary School a public <br /> Development project.Acting an residential units within the University ry , <br /> behalf of the City, he oversaw the Research Center. He oversaw the K-6 school located on Navy-awned <br /> review of technical studies including review of technical studies property at Naval Base Coronado. In <br /> air quality, addressing air quality, GHG this role, he led all planning activities <br /> q ty,greenhouse gas g q y <br /> emissions, noise, and lighting, emissions, biological resources, necessary to support the <br /> ensuring consistency with CEQA geotechnical conditions, hydrology, modernization of the aging school <br /> requirements and the City's water quality, and site contamination. facilities, including site planning, <br /> environmental policies. He evaluated Terrance ensured that the Addendum coordination with installation <br /> the Addendum for proper tiering, properly tiered from the City's 2045 command, and alignment with both <br /> legal adequacy, and internal General Plan EIR in accordance with Navy and Department of Defense <br /> consistency with the prior certified CEQA Guidelines Section 15164, and Education Activity standards. <br /> EIR.Terrance also prepared detailed <br /> www.epdsolutions.com 1 3333 Michelson Drive,Suite 500,Irvine,CA 92612 1 949-794-1180 Page 2 of 5 <br />