Consultant shall coordinate with City staff to obtain record copies of utility maps from each <br />utility owner within the project limits for existing and/or proposed utility facilities. Consultant <br />shall include mapping and/or exhibits that clearly define the project limits as part of the requests <br />for utility information. Consultant shall identify utility companies affected by the project and <br />delineate utilities within the project's sphere of influence on the plans. Consultant shall prepare <br />preliminary plans, which shall include all existing utilities (above ground and below ground) <br />identified by location, size, type, and owner, as appropriate. Consultant shall check horizontal <br />and vertical clearances for utilities and coordinate design with the various utility companies to <br />address conflicts. In addition to information provided by the owning utility companies and <br />through research of other record maps, field surveys shall be used to locate utility features such <br />as manholes, valves, fire hydrants, poles, risers, etc., which shall be reflected on the plans. <br />Focused coordination and meetings with OCTA and SCRRA on the disposition of utilities <br />within and adjacent to the railroad ROW shall be required. <br />Consultant shall hire contractor to pothole all utilities that shall be affected with the Project. <br />Consultant shall coordinate the use of field survey crews to locate potholed utilities by <br />coordinates and elevations based on the project's survey controls. <br />Known utility conflicts shall be shown on the plans with construction notes indicating action to <br />be taken and by whom. Inventory numbers of poles, vaults and other surface facilities shall be <br />shown on the plans for those facilities that have such numbers attached to the facility and as <br />provided on the owner's inventory maps. <br />Consultant shall send preliminary design plans to owning utility companies within the project <br />limits with requests for review and comments on the plans relevant to their respective facilities, <br />and with requests for other project specific information. <br />The Consultant shall track the progress/schedule of the utility company relocation plan <br />preparation in order to have the utility facility relocated prior to construction or to ensure final <br />approved utility relocation plans are attached to the City construction plans including the <br />number of working days required by the Utility to construct their facilities clearly identified in <br />the Special Provisions. <br />A utility matrix shall be prepared listing the facility type, construction material, location/depth <br />and disposition of utilities within the project limits. Consultant shall tie position of boring <br />locations, with elevation. <br />Consultant shall monitor responses of utility notices received and make recommendations for <br />mitigating conflicts. Consultant shall provide written responses to utility companies with regard <br />to stated concerns and conduct design coordination meetings with utility companies as needed. <br />Unresolved issues shall be brought to the attention of the City's Project Manager as early as <br />practical. <br />Utility conflict issues shall be resolved prior to the completion of the final design plans as <br />follows: <br />