My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BKM OFFICE ENVIRONMENTS, INC.
Clerk
>
Contracts / Agreements
>
B
>
BKM OFFICE ENVIRONMENTS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2026 4:50:47 PM
Creation date
6/11/2026 3:39:11 PM
Metadata
Fields
Template:
Contracts
Company Name
BKM OFFICE ENVIRONMENTS, INC.
Contract #
A-2026-070
Agency
Community Development
Council Approval Date
4/21/2026
Expiration Date
4/20/2027
Insurance Exp Date
12/30/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(9) <br />1.7 Quality Assurance <br />A. Installer Qualifications <br />CITY OF SANTA ANA <br />1. Contractor is responsible for coordination of all electrical and cabling with the Project Manager <br />to ensure seamless installation of power and tele/data to both the furniture and workstations. <br />2. Contractor shall provide an on -site supervisor to direct installation of all furniture items. <br />1.8 Pre -Installation Meetings <br />A. Convene minimum of two weeks prior to commencing work. <br />1.9 Delivery, Storage and Handling <br />A. Store products in manufacture's unopened packaging until ready for installation. <br />B. Assemble and finish furniture at factory and deliver to site ready for installation. <br />C. Protect items during delivery, storage and after installation so that there will be no indication of <br />abuse or damage at the time of substantial completion of the Project. Replace or repair, to <br />showroom condition, damaged work as directed by the Project Manager. <br />D. Materials damaged due to improper protection during storage (dampness included) shall be <br />rejected and removed from the site. <br />E. Delivery during normal business hours, Monday — Thursday 8:00 AM — 5:00 PM and alternating <br />Friday's (excluding holidays) and include full use of stairs and elevators in multi -story buildings. <br />Size and location of stairs and elevators to be confirmed by Contractor. <br />F. All deliveries to be confirmed and approved by Project Manager. <br />2.0 Definitions <br />A. UL Listed — Underwriters Laboratories Inc. <br />B. ANSI/BIFMA—American National Standard For Office Furnishings <br />C. NFPA — National Fire Protection Association <br />D. NEC — National Electrical Code <br />E. ADA Accessibility Guidelines for Buildings and Facilities <br />F. California Technical Bulletin 117 - Requirements, Test Procedure and Apparatus for Testing the <br />Flame Retardance of Resilient Filling Materials Used in Upholstered Furniture <br />G. GreenGuard Certified — Certification for furniture means the product has been scientifically tested <br />by UL Solutions, a third party organization, to ensure it emits low levels of Volatile Organic <br />Compounds (VOCs) and other harmful chemicals, contributing to better indoor air quality. <br />2.1 Office Furniture Components <br />A. General <br />1. Layouts shall be comprised of components that can be seamlessly combined to create a <br />
The URL can be used to link to this page
Your browser does not support the video tag.