My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - CONTRACT AWARD-ST REPAIR PHASE 14
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
09/07/2010
>
23A - CONTRACT AWARD-ST REPAIR PHASE 14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:00:42 PM
Creation date
9/2/2010 1:05:40 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
23A
Date
9/7/2010
Destruction Year
2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COOPERATIVE AGREEMENT <br />FOR STREET REHABILITATION <br />PROJECT (PHASE 14) <br />THIS COOPERATIVE AGREEMENT is entered into this _ day of September, 2010, by <br />and between the COMMUNITY REDEVELOPMENT AGENCY OF THE CITY OF SANTA <br />ANA, a public body corporate and politic (the "Agency"), and the CITY OF SANTA ANA, a <br />charter city and municipal corporation duly organized and existing under the Constitution and laws <br />of the State of California (the "City"). <br />WITNESSETH <br />A. The Agency is undertaking certain activities necessary for the execution of the City <br />of Santa Ana redevelopment projects (the "Projects") under the provisions of the California <br />Community Redevelopment Law (Health and Safety Code Section 33000 et seq.) and pursuant to <br />the redevelopment plans for the Projects. <br />B. The Agency desires to contract with the City for the City to provide for the <br />construction and rehabilitation of public improvements projects which, in this case, will consist of <br />the street resurfacing and curb, gutter and/or sidewalk rehabilitation of the following streets within <br />the Merged Project Area: <br />3rd Street from Garfield Street to Breeden Street and Breeden Street from 3' Street to 4' <br />Street, as well as Hutton Centre Drive from Sandpointe Avenue to Hutton Centre Drive <br />(included within Phase 14) Street Improvements (Project No. 106730). Such work will be <br />referred to hereinafter as "Publicly Owned Improvements" in connection with the <br />Agency's redevelopment activities within the Merged Project Area <br />C. The Agency is willing in connection with the provision of such Publicly Owned <br />Improvements by the City, to pay for a portion of the total rehabilitation costs of such Publicly <br />Owned Improvements. <br />D. The City has initially paid or will initially pay for said Publicly Owned <br />Improvements on the condition that the Agency contribute to the costs of such rehabilitation work <br />on the Publicly Owned Improvements. <br />NOW, THEREFORE, the parties hereto do mutually agree as follows: <br />SCOPE OF WORK <br />The City will be contracting with the lowest and best bidder to perform Phase 14 of the <br />Street Improvements pursuant to plans and specifications to be prepared by the City. Phase 14 of <br />Project 106730 includes reconstruction of asphalt pavement and replacement of damaged concrete <br />1 <br />23A-7
The URL can be used to link to this page
Your browser does not support the video tag.