My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALL AMERICAN ASPHALT (LYON STREET REHABILITATION FROM EDINGER TO CHESTNUT FEDERAL PROJECT NO. ESPL 5063(138))
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ALL AMERICAN ASPHALT (LYON STREET REHABILITATION FROM EDINGER TO CHESTNUT FEDERAL PROJECT NO. ESPL 5063(138))
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2016 3:58:53 PM
Creation date
9/13/2010 10:24:27 AM
Metadata
Fields
Template:
Contracts
Company Name
ALL AMERICAN ASPHALT
Contract #
11-6733
Agency
Public Works
Council Approval Date
9/7/2010
Destruction Year
2015
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
http: / /fiwcbgate.access. gpo. gov /cgi- bin/getdoc.cgi ?dbname= Davis- Baco... <br />BRICKLAYER; MARBLE SETTER ........ $ 34.55 11.56 <br />---------------------------------------------------------------- <br />BRCA0018 -004 06/01/2008 <br />Rates Fringes <br />MARBLE FINISHER ..................$ 25.52 9.08 <br />TILE FINISHER ....................$ 21.07 7.88 <br />TILE LAYER .......................$ 32.05 11.99 <br />---------------------------------------------------------------- <br />BRCA0018 -010 09/01/2009 <br />Rates Fringes <br />TERRAZZO FINISHER ................$ 26.59 9.62 <br />TERRAZZO WORKER/SETTER ........... $ 33.63 10.46 <br />---------------------------------------------------------------- <br />CARP0409 -001 07/01/2010 <br />Rates Fringes <br />CARPENTER <br />(1) Carpenter, Cabinet <br />Installer, Insulation <br />Installer, Hardwood Floor <br />Worker and acoustical <br />installer ...................$ <br />37.35 <br />11.08 <br />(2) Millwright ..............$ <br />37.85 <br />11.08 <br />(3) Piledriver /Derrick <br />Bargeman, Bridge or Dock <br />Carpenter, Heavy Framer, <br />Rock Bargeman or Scowman, <br />Rockslinger, Shingler <br />(Commercial) ................$ <br />37.48 <br />11.08 <br />(4) Pneumatic Nailer, <br />Power Stapler ...............$ <br />37.60 <br />11.08 <br />(5) Sawfiler ...............$ <br />37.44 <br />11.08 <br />(6) Scaffold Builder ....... <br />$ 28.55 <br />11.08 <br />(7) Table Power Saw <br />Operator ....................$ <br />37.45 <br />11.08 <br />FOOTNOTE: Work of forming in the construction of open cut <br />sewers or storm drains, on operations in which horizontal <br />lagging is used in conjunction with steel H -Beams driven or <br />placed in pre- drilled holes, for that portion of a lagged <br />trench against which concrete is poured, namely, as a <br />substitute for back forms (which work is performed by <br />piledrivers): $0.13 per hour additional. Certified Welder <br />- S1.00 per hour premium. <br />CARP0409 -005 07/01/2010 <br />Rates Fringes <br />Drywall <br />DRYWALL INSTALLER/LATHER .... $ 37.35 11.08 <br />STOCKER/SCRAPPER ............ $ 10.00 6.67 <br />---------------------------------------------------------------- <br />ELEC0011 -002 02/01/2010 <br />COMMUNICATIONS AND SYSTEMS WORK <br />Communications System <br />Rates Fringes <br />JULY 29, 2010 <br />ADDENDUM NO. ONE <br />2 of 22 7/28/2010 9:26 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.