My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALL AMERICAN ASPHALT (LYON STREET REHABILITATION FROM EDINGER TO CHESTNUT FEDERAL PROJECT NO. ESPL 5063(138))
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ALL AMERICAN ASPHALT (LYON STREET REHABILITATION FROM EDINGER TO CHESTNUT FEDERAL PROJECT NO. ESPL 5063(138))
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2016 3:58:53 PM
Creation date
9/13/2010 10:24:27 AM
Metadata
Fields
Template:
Contracts
Company Name
ALL AMERICAN ASPHALT
Contract #
11-6733
Agency
Public Works
Council Approval Date
9/7/2010
Destruction Year
2015
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
http: / /frwebgate. access. gpo. gov /cgi- bin /getdoc.cgi?dbnanie= Davis- Baco... <br />JULY 29, 2010 <br />rods or grounding systems, rock necessary for leveling and ADDENDUM NO. ONE <br />drainagae as well as pouring of a concrete envelope if <br />needed. <br />JOURNEYMAN TRANSPORTATION ELECTRICIAN shall perform all tasks <br />necessary toinstall the complete transportation system. <br />JOURNEYMAN TECHNICIAN duties shall consist of: Distribution <br />of material at job site, manual excavation and backfill, <br />installation of system conduits and raceways for <br />electrical, telephone, cable television and comnmunication <br />systems. Pulling, terminating and splicing of traffic <br />signal and street lighting conductors and electrical <br />systems including interconnect, dector loop, fiber optic <br />cable and video /data. <br />ELEC1245 -001 06/01/2009 <br />HOLIDAYS: New Year's Day, M.L. King Day, Memorial Day, <br />Independence Day, Labor Day, Veterans Day, Thanksgiving Day <br />and day after Thanksgiving, Christmas Day <br />---------------------------------------------------------------- <br />ELEV0018 -001 01/01/2010 <br />Rates Fringes <br />ELEVATOR MECHANIC ................$ 45.33 20.035 <br />FOOTNOTE: <br />PAID VACATION: Employer contributes 8% of regular hourly <br />rate as vacation pay credit for employees with more than 5 <br />years of service, and 6% for 6 months to 5 years of service. <br />PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, <br />Labor Day, Veterans Day, Thanksgiving Day, Friday after <br />Thanksgiving, and Christmas Day. <br />ENGIO012 -003 07/01/2009 <br />Rates Fringes <br />OPERATOR: Power Equipment <br />(All Other work) <br />GROUP <br />Rates <br />Fringes <br />LINE CONSTRUCTION <br />17.22 <br />GROUP <br />(1) Lineman; Cable splicer..$ <br />44.47 <br />13.11 <br />(2) Equipment specialist <br />GROUP <br />3 <br />(operates crawler <br />37.90 <br />17.22 <br />tractors, commercial motor <br />4 <br />....................$ <br />vehicles, backhoes, <br />17.22 <br />GROUP <br />trenchers, cranes (50 tons <br />....................$ <br />40.49 <br />and below), overhead & <br />GROUP <br />6 <br />underground distribution <br />39.61 <br />17.22 <br />line equipment) ........... $ <br />35.52 <br />12.07 <br />(3) Groundman ...............$ <br />27.17 <br />11.82 <br />(4) Powderman ...............$ <br />39.71 <br />12.23 <br />HOLIDAYS: New Year's Day, M.L. King Day, Memorial Day, <br />Independence Day, Labor Day, Veterans Day, Thanksgiving Day <br />and day after Thanksgiving, Christmas Day <br />---------------------------------------------------------------- <br />ELEV0018 -001 01/01/2010 <br />Rates Fringes <br />ELEVATOR MECHANIC ................$ 45.33 20.035 <br />FOOTNOTE: <br />PAID VACATION: Employer contributes 8% of regular hourly <br />rate as vacation pay credit for employees with more than 5 <br />years of service, and 6% for 6 months to 5 years of service. <br />PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, <br />Labor Day, Veterans Day, Thanksgiving Day, Friday after <br />Thanksgiving, and Christmas Day. <br />ENGIO012 -003 07/01/2009 <br />Rates Fringes <br />OPERATOR: Power Equipment <br />(All Other work) <br />GROUP <br />1 <br />....................$ <br />36.83 <br />17.22 <br />GROUP <br />2 <br />....................$ <br />37.61 <br />17.22 <br />GROUP <br />3 <br />....................$ <br />37.90 <br />17.22 <br />GROUP <br />4 <br />....................$ <br />39.39 <br />17.22 <br />GROUP <br />5 <br />....................$ <br />40.49 <br />17.22 <br />GROUP <br />6 <br />....................$ <br />39.61 <br />17.22 <br />GROUP <br />7 <br />....................$ <br />40.71 <br />17.22 <br />GROUP <br />8 <br />....................$ <br />39.72 <br />17.22 <br />GROUP <br />9 <br />....................$ <br />40.82 <br />17.22 <br />5 of 22 7/28/2010 9:26 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.