My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALL AMERICAN ASPHALT (LYON STREET REHABILITATION FROM EDINGER TO CHESTNUT FEDERAL PROJECT NO. ESPL 5063(138))
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ALL AMERICAN ASPHALT (LYON STREET REHABILITATION FROM EDINGER TO CHESTNUT FEDERAL PROJECT NO. ESPL 5063(138))
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2016 3:58:53 PM
Creation date
9/13/2010 10:24:27 AM
Metadata
Fields
Template:
Contracts
Company Name
ALL AMERICAN ASPHALT
Contract #
11-6733
Agency
Public Works
Council Approval Date
9/7/2010
Destruction Year
2015
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />~PROJECT NO. 11 -6733: LYON STREET REHABILITATION FROM EDINGER TO CHESTNUT <br />FEDERAL PROJECT NO. ESPL 5063(138) <br />• PROPOSAL & CONTRACT AGREEMENT <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: <br />REQUIREMENT: <br />The undersigned declares that he /she has carefully examined the location of the proposed work, that <br />he /she has examined the Plans and Specifications and read the accompanying instruction to BIDDERS, <br />and hereby proposes to furnish all material and do all the work required to complete the said work in <br />accordance with said plans (if any), specifications and special provisions, for the unit price(s) or lump <br />sum(s) set forth in the following schedule: <br />Item # Bid Item Unit Quantity Unit Price Amount <br />ALTERNATE A <br />$Lao -- <br />1. <br />Unclassified Excavation <br />CY <br />150 <br />$ 1 ] l2— k <br />2. <br />AC Pavement <br />TN <br />5,500 <br />• <br />$ %22c5- <br />$ �. (� S <br />$ 2 41 & a5- <br />$ (a <br />$ S'b- <br />3. <br />Pulverize and CTB <br />SF <br />176,400 <br />4. <br />Remove Excess Pulverized Material <br />CY <br />1,500 <br />$132o- <br />5. <br />Pavement Fabric <br />SY <br />26,700 <br />6. <br />Cold Mill <br />SF <br />45,500 <br />7. <br />Construct Curb Ramp <br />SF <br />3,700 <br />8. <br />Construct PCC Driveway <br />SF <br />100 <br />9. <br />Construct PCC Cross Gutter <br />SF <br />1,600 <br />10. <br />Construct PCC Curb and Gutter <br />LF <br />600 <br />11. <br />Construct PCC Sidewalk (T =4 ") <br />SF <br />600 <br />12. <br />Core Curb At Existing Sidewalk Drain <br />EA <br />6 <br />13. <br />PCC Grind <br />LF <br />40 <br />14. <br />Root Shave <br />EA <br />2 <br />• <br />15. <br />Adjust Water Valve Frame and Cover <br />EA <br />11 <br />and Adjust to Finished Grade <br />$Lao -- <br />$2-q oo® - <br />-- <br />$ U2'' <br />$q i 0oo °- <br />� <br />$a 52 <br />$ 1 ] l2— k <br />$ 23. SO <br />$ -7 q <br />$ l 155- <br />$ .2-7 <br />$ %22c5- <br />$ �. (� S <br />$ 2 41 & a5- <br />$ (a <br />$ S'b- <br />$ �- <br />$j3 qq <br />$ <br />$33- <br />$132o- <br />$357- <br />$ -7Iq- <br />$ y� <br />$50qcl <br />TO BE INCLUDED IN BID PACKAGE <br />BP 1 of 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.