Laserfiche WebLink
MAYOR <br />Miguel A. Pulido <br />MAYOR PRO TEM <br />Claudia C. Alvarez <br />COUNCILMEMBERS <br />David Benavides <br />Carlos Bustamante <br />Michele Martinez <br />Vincent F. Sarmiento <br />Sal Tinajero <br />December 10, 2009 <br />ADDENDUM No. ONE <br /> <br />~~~a <br />s <br />tz=~,~ <br />CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY M-36 <br />P.O. Box 1988 <br />Santa Ana, California 92702 <br />CITY MANAGER <br />David N. Ream <br />CITY ATTORNEY <br />Joseph W. Fletcher <br />CLERK OF THE COUNCIL <br />Maria D. Huizar <br />SUBJECT: Project No. 106718: Residential Street Repair Reconstruction - <br />Phase 12 <br />The following changes have been made to the specifications of the subject project: <br />Specifications <br />Page iv, replace with the attached Page iv (REV: 12/10/09). Change Bid Open <br />date from Tuesday, December 15 to Thursday, December 17. <br />2. Page BP 1 and 2 of 14, replace with the attached BP 1 and 2 of 14. <br />3. Page ii, replace with the attached Page ii. <br />4. Page 31, after Section 2.20, add Section 2.21 as the following: <br />2.21 PAVEMENT FABRIC <br />This section shall conform to Section 213 and 302-7 of the Standard <br />Specifications and these Special Provisions. <br />Pavement fabric shall overlap street reconstruction areas by 6" minimum. <br />5. Page 25, after the last paragraph of Section 2.13 PORTLAND CEMENT <br />CONCRETE PAVEMENT CONSTRUCTION, add the following: <br />Concrete pavement at the Santa Ana Regional Transportation Center shall be <br />eight (8) inches deep and reinforced with number four (4) rebar spaced twelve <br />(12) inches on center. Payment for the concrete pavement, rebar, and removal <br />and disposal of existing PCC shall be made at the contract unit price for Remove <br />and Replace PCC Pavement and shall include compensation for doing all <br />appurtenant work, including furnishing all materials, labor, equipment, tools and <br />all incidentals as required and no additional compensation will be allowed <br />therefore. <br />6. Add "Exhibit A" to Appendix H after "Exhibit 12" Page 12 of 12. <br />