My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03 YRENDHSGPROJ&ACT
Clerk
>
Agenda Packets / Staff Reports
>
Housing Authority (1999 - Present)
>
2008
>
08/18/2008
>
03 YRENDHSGPROJ&ACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:30:53 PM
Creation date
9/20/2010 4:50:23 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
03
Date
8/18/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
earyEnd Report far Housing Diva.sian <br /> Projects and Activities <br /> August 1 ~0~8 <br /> Page 4 <br /> of studio apartn~ez~ts, and they were to be converted into 49 ana, two <br /> and three bedroom units, of these, 48 were to be restricted to very low- <br /> and ~.a~u-~incom.e household a~ a.f fordable rent . The remaining unit was ~a <br /> be reserved for an ar~s~,te manager. All wank has been car~pleted, and the <br /> s <br /> bul.~.dings have been leased up in accordance w~.th the affordability <br /> requirements. <br /> Raitt street Infili site <br /> civic center Barria Hauling carparatio~ has seleoted a project architect, <br /> Lim chang Roh~.ing and Assaoiates, and an agreement to fund the design of <br /> the project was approved by the City council February ~~7. Upcoming <br /> milestones include the preparat~.an of a site surrey, development of an <br /> acceptable site plan, pro forma a~.d construction post estimate. This <br /> material will form the basis of a Disposl.tion and Development ~.greement - <br /> ~DDA}, which is anticipated to be considered in January of ~~~9. <br /> 10 ~ ~ Black of Logan <br /> The Logan infil.l project consists of three vacant Iats located at 10~~, <br /> 101, and 101 North Logan streets grange County commur~l,ty Hauling - <br /> Corparation ~DCCHC~ has now reached an agreement with the Planna.ng and <br /> Building Agency cancer~,ing site plays, elevation and facades of the three <br /> single family domes to be developed an these lots. A full cast analysis <br /> is raw complete. CccHC, their partners at Taller fan dose and staff are <br /> curre~.tly ~.egotiating terms to be ir~corparated into a DDA. staff . <br /> anticipates bringing the DDA to the Redevelapmen.t Agency for approval in - <br /> the August of <br /> RsT~McFaddez~ <br /> staff is currently r~egotl.ating the development of two parcels at the <br /> corner of N~cFadden and ar~.nge with The Ran Simon Education and Hauling - <br /> Foundation. This is a pilot project which will demonstrate that haves <br /> can be built in an expedited a~,d efficient manner with bel.aw market <br /> construction casts. staff anticipates bri~.ging a DDA to the <br /> Redevelopment Agency in septernber ~~OS. <br /> <br /> Birch Infill Project <br /> <br /> The Birch infill project consists of four vacant l.ats located at the 2DO <br /> and 400 blacks of Birch in the Heninger Park Nelghborhaad. A total. of <br /> faur single family homes will be built. The plans have already been <br /> <br /> approved and al.l e~.viranmental clearances have been obtained. Agency <br /> staff is currently exploring development options, <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.