Laserfiche WebLink
Upon completion of the field work an inventory list of all equipment inspected and <br />all potential problems that were located will be uploaded to our server and a web <br />based report will be prepared. Once we have reviewed your report, we will email <br />you a secure login and password so that you can view the report on line. <br />Having performed this type of inspection at similar facilities, we estimate that the <br />inspection can be completed in four (4) field days. The cost of the inspection, <br />report preparation and to remove and replace all panel covers at ALL 22 well <br />sights and 7 pumping stations will be billed at a total cost of $49Q0. This price <br />holds good for 90 days. <br />Due to the risks involved, THERMOTEST will no longer remove /replace <br />transformer covers while under load. It has been deemed unsafe by OSHA, and <br />other agencies involved with safety in the work place. We will continue to inspect <br />transformers, provided that either the client or an electrical contractor removes and <br />replaces the cover. <br />In the event that THERMOTEST is not given at least 24 hours notice of <br />cancellation before the start of an inspection, or THERMOTEST is not allowed <br />to perform an inspection after arriving at a job site for any reason, there will be a <br />"show -up" charge of $500. <br />Should you required additional information regarding this proposal please do not <br />hesitate to contact me. <br />Sincerely, <br />Scott Sogaard <br />Sales, Southern California <br />Administrative Office: 3070 Kerner Boulevard, Suite A, San Rafael, CA 94901 • (415) 453 -7200 Fax (415) 453 -2065 <br />Los Angeles (310) 791 -2777 Central Valley (209) 632 -6167 Oregon (541) 488 -0431 San Diego (619) 448 -7256 <br />Toll Free: (800) 640 -3133 (USA) email: irtest @pacbell.net <br />