My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19D - WATER METER REPLACEMENT SRVCS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
10/04/2010
>
19D - WATER METER REPLACEMENT SRVCS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:59:09 PM
Creation date
9/29/2010 2:43:11 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
19D
Date
10/4/2010
Destruction Year
2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Submit Notice of Intent to Respond to City XXXX, 2010 <br />Submit Questions to City XXXX, 2010 <br />Submit Proposals to City XXXX, 2010 <br />Award Contract XXXX, 2010 <br />Begin Work XXXX, 2010 <br />Proposals are due in the office of the Executive Director, Public Works Agency, at <br />20 Civic Center Plaza, Ross Annex, M-21, 4th Floor, Santa Ana, California, 92701, <br />ATTN: Thomas Dix, on or before 4:00 p.m., XXXX, 2010. <br />1. ISSUING OFFICE <br />Santa Ana Public Works Agency, Office of the Executive Director, 20 Civic Center <br />Plaza, Ross Annex, 4th Floor, M-21, Santa Ana, California 92701. <br />J. PROPOSAL REJECTION <br />The City reserves the right to reject any or all proposals submitted, and is not liable for <br />any pre-contractual expenses: <br />Pre-contractual expenses are ` defined as expenses incurred by the offeror in: (a) <br />preparing the proposal in response to this RFP; (b) submitting that proposal to the City; <br />(c) negotiating with the City in any matter related to this proposal; (d) any other <br />expenses incurred by offeror prior to date of award, if any, of the contract. Offeror shall <br />not include any such expenses as part of the price as proposed in response to this RFP. <br />K. ADDENDA <br />Any subsequent changes in the RFP from the date of issuance to the date of submittal <br />will result in an addendum by the issuing office to those parties who have provided the <br />proper notice of interest in responding to the RFP. <br />L. PROPOSAL CONTENT AND SIGNATURE <br />Three (3) copies of the proposal will be required with all copies having been signed by <br />the individual or, if a company, the company official with the power to bind the company <br />in its proposal. The fee schedule, Attachment D (3 copies) and Attachment A shall be <br />separately bound, sealed, and submitted to the City. To be considered, all proposals <br />shall be completely responsive to the RFP. <br />M. ACCEPTANCE OF CONTRACT <br />The contents of the proposal of the successful consultants shall become a contractual <br />obligation if a contract ensues. Failure of a consultant to accept this obligation will <br />result in the cancellation of any award. Any damage accruing to the City as a result of a <br />CITY OF SANTA ANA WATER METER REPLACEMENT SERVICES <br />City of Santa Ana P.W.A. Water Resources <br />19D-8 <br />Page 6 of 27
The URL can be used to link to this page
Your browser does not support the video tag.