My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/23/2006
Clerk
>
Minutes
>
Planning Commission
>
2006
>
01/23/2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:57:26 PM
Creation date
10/6/2010 2:07:45 PM
Metadata
Fields
Template:
PBA
Doc Type
Minutes
Date
1/23/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECOMMENDATION: <br />1. Approve and adopt the Mitigated Negative Declaration and Mitigation <br />Monitoring Program, Environmental Review No. 2005-28. <br />2. Adopt a resolution approving Conditional Use Permit No. 2005-33 as <br />conditioned. <br />Karen Haluza presented the staff report and recommendation. <br />The Commission expressed concerns with the quality of the mausoleum <br />architecture, the seeming incongruity of the semi-private mausoleums and <br />pavilion building architecture with the community mausoleum, the quality of the <br />building materials and that they lack the sense of permanence such a structure <br />demands and that materials such as real stone would provide. The Commission <br />requested more detail on the community mausoleum windows. The plans were <br />not clear as to whether the windows were faux or real, if spandrel glass is <br />proposed for some of the windows, if the windows could be more successfully <br />replaced by niches or decorative ironwork. The Commission also requested <br />more detail about how the interior of the community mausoleum would work and <br />what the other elevations would look like. <br />The Commission discussed the need for a signal, or other form of protected <br />pedestrian crossing, between the existing southern cemetery and the proposed <br />northern expansion. The applicant, Ms. Marla Noel, explained how the cemetery <br />currently provides for uniformed traffic control officers to assist pedestrians in <br />crossing the street during services. Taig Higgins, of the Public Works Agency, <br />addressed the Commission's questions regarding the safety and effectiveness of <br />a signal so close to the existing signal at Cambridge and Fairhaven. The <br />Commission directed staff to work with the applicant to answer these questions, <br />work to improve the building materials and architecture and provide further <br />details. <br />The public hearing was opened. <br />Mike Martin voiced concern with length of construction period, traffic impacts, <br />hours of operation for new addition, landscape for existing Cypress trees, <br />economic impact for neighborhood, and rodent pest control during construction. <br />Applicant Marla Noel spoke in support of the project. <br />The public hearing was closed. <br />MOTION: <br />1. Continue the public hearing to February 13, 2006. <br />2. Recommendation to change Planning Condition No. 13 that affects <br />the hours of operation for construction to start at 8:00 a.m. and <br />Condition No.14 that affects the operation of construction equipment <br />starting at 8:00 a.m. on Saturday. <br />3. Direct staff to address Commission concerns regarding: traffic <br />signal on Cambridge, liability to City, window designs, material <br />selections, mausoleum architecture, landscape to the north, and <br />underground utilities. <br />MOTION: Lutz SECOND: Leo <br />VOTE: AYES: Betancourt, Cribb, De La Torre, Gartner, Leo, Lutz, <br />Rodriguez (7) <br />NOES: None (0) <br />ABSTAIN: None (0) <br />ABSENT: None (0) <br />2. Public Comments (for items not on the agenda) <br />No comments were made. <br />Planning Commission Minutes 4 January 23, 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.