My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
80A - TRANSIT ZONING CODE - FEIR - SUPPLEMENTAL - REPONSE TO COMMENTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
06/07/2010
>
80A - TRANSIT CODE AND STATION DISTRICT - FULL PACKET LISTED INDIVIDUALLY
>
80A - TRANSIT ZONING CODE - FEIR - SUPPLEMENTAL - REPONSE TO COMMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:08:36 PM
Creation date
10/8/2010 4:16:51 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
80A
Date
6/7/2010
Destruction Year
P
Notes
supplemental EIR Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Ms. Lucy Linnaus 4 June 1, 2010 <br /> Senior Planner <br /> emissions standards. In addition, all construction equipment shall be <br /> outfitted with the BACT devices certified by CARB. Any emissions <br /> control device used by the contractor shall achieve emissions reductions <br /> that are no less than what could be achieved by a Level 2 or Level 3 diesel <br /> emissions control strategy for a similarly sized engine as defined by <br /> CARB regulations. <br /> ? Januarys 1, 2012, to December 31, 2014: All offroad diesel-powered <br /> construction equipment greater than 50 hp shall meet Tier 3 offroad <br /> emissions standards. In addition, all construction equipment shall be <br /> outfitted with BACT devices certified by CARB. Any emissions control <br /> device used by the contractor shall achieve emissions reductions that are <br /> no less than what could be achieved by a Level 3 diesel emissions control gQMD-6 <br /> strategy for a similarly sized engine as defined by CARB regulations. contd. <br /> ? Post-January 1, 2015: All offroad diesel-powered construction equipment <br /> greater than 50 hp shall meet the Tier 4 emission standards, where <br /> available. In addition, all construction equipment shall be outfitted with <br /> BACT devices certified by CARB. Any emissions control device used by <br /> the contractor shall achieve emissions reductions that are no less than what <br /> could be achieved by a Level 3 diesel emissions control strategy for a <br /> similarly sized engine as defined by CARB regulations. <br /> ? A copy of each unit's certified tier specification, BACT documentation, <br /> and CARB or AQMD operating permit shall be provided at the time of <br /> mobilization of each applicable unit of equipment. <br /> For additional measures to reduce off-road construction equipment, refer to <br /> the mitigation measure tables located at the following website: AQMD-7 <br /> www.admd. og v/cega/handbook/mitigation/MM intro.html. <br /> The lead agency should consider encouraging construction contractors to <br /> apply for AQMD "SOON" funds. As an example, incentives could be <br /> provided in the bidding process for those construction contractors who apply <br /> for AQMD "SOON" funds. The "SOON" program provides up to $60 million gQMD-8 <br /> dollars to accelerate clean up of off-road diesel vehicles, such as heavy duty <br /> construction equipment. More information on this program can be found at <br /> the following website: <br /> http://www.agmd. Gov/tao/Implementation/SOONPro ~r am.htm <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.