My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
80A - TRANSIT ZONING CODE - FEIR - SUPPLEMENTAL - REPONSE TO COMMENTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
06/07/2010
>
80A - TRANSIT CODE AND STATION DISTRICT - FULL PACKET LISTED INDIVIDUALLY
>
80A - TRANSIT ZONING CODE - FEIR - SUPPLEMENTAL - REPONSE TO COMMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:08:36 PM
Creation date
10/8/2010 4:16:51 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
80A
Date
6/7/2010
Destruction Year
P
Notes
supplemental EIR Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 12 Responses to Comments Received Since Publication of the Final EIR <br /> X11. Air Quality <br /> Response to Comment ~2.01~ <br /> Commenter states that siting sensitive uses within 500 feet of a freeway should be avoided. Refer to <br /> Response AQMD-2. <br /> Response to Comment ~2.02~ <br /> Commenter states the MM4.2-7 through MM4.2-7 are not "sufficient." Refer to Response AQMD-5. <br /> Response to Comment ~2:03~ <br /> Commenter states that MM4.2-7 through MM4.2-17wi11 not be subject to public scrutiny. MM4.2-7 <br /> through MM4.2-17 fully meet CEQA requirements for enforceable mitigations measures. The mitigation <br /> measures require that the air emission requirements "shah' be specified in the construction contracts. <br /> <br /> These contracts will be reviewed by the City staff prior to the issuance of grading permits. The <br /> construction contracts will also be approved by the City of Santa Ana. Refer to Chapter 11 (Mitigation <br /> Monitoring and Reporting Program). <br /> Response to Comment ~2:04~ <br /> <br /> The commenter states that "MM2.2-2 through -6 are unenforceable because they only say what the <br /> contractor "should" do. The commenter is incorrect. MM2.2-2 through MM2.2-6 all state what the <br /> contractor "shall" do. <br /> X111. Air Quality-Greenhouse Gas Emissions <br /> Response to Comment ~3.01~ <br /> <br /> The commenter states that the EIR does not define "feasible." The EIR uses the term "feasible" <br /> pursuant to CEQA: Pub. Res. Code ~ 21061.1 and CEQA Guidelines ~ 15354 state that "feasible means <br /> capable of being accomplished in a successful manner within a reasonable period of time, taking into <br /> account economic, environmental, social, and technological factors." Also refer to Response to <br /> Comment AQMD-5. <br /> Response to Comment ~3.02~ <br /> Commenter proposes additional mitigation measures to reduce greenhouse gas emissions. <br /> ¦ Streetlights replaced with more efficient lighting. <br /> > Response: The Transit Zoning Code area contains streetlights that have a mix of ownership <br /> between the City and Southern California Edison. The City continuously works with Southern <br /> California Edison to ensure that all streetlights are equipped with the most energy efficient and <br /> cost effective technology. Most recently the City and Southern California Edison have been <br /> exploring the possibility of replacing streetlights with LED technology. In order to determine if <br /> this technology can be successfully deployed citywide Southern California Edison has <br /> conducted tests on the LED technology. These tests have found that energy savings and <br /> equipment longevity are not predictable. The City is also independently testing limited areas <br /> <br /> City of Santa Ana Transit Zoning Code (SD 84A and SD 84B) EIR 12-37 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.