My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19H - RFP - RIGHT OF WAY SRVS CAPITAL IMPROVEMENT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
10/18/2010
>
19H - RFP - RIGHT OF WAY SRVS CAPITAL IMPROVEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:58:35 PM
Creation date
10/14/2010 11:00:23 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
19H
Date
10/18/2010
Destruction Year
2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL REQUIREMENTS - RIGHT OF WAY SERVICES <br />Consultants under contract with the City of Santa Ana will provide support to City of Santa <br />Ana staff or their designee. The Consultants shall be thoroughly familiar with the Statement <br />of Work prior to submitting a response to this Request for Qualifications (RFQ). <br />• The Consultant shall perform work to produce a high quality, professional and complete <br />work product. <br />• Consultant must have experience with State and Federally funded projects. All work shall <br />be performed in conformance with all applicable regulations, policies, procedures and <br />standards. <br />• Real estate appraisers provided by the Consultant must be certified and a Member of the <br />Appraisal Institute. <br />• All acquisition agents and property managers, performing work for the City, must hold a <br />valid California Real Estate License. Salespersons must be registered with California <br />Department of Real Estate (DRE), as working solely under the Consultant's supervising <br />broker of record. <br />• Work may include, but not be limited to, the following: onsite review of the project area; <br />review of existing records; conducting research and performing analysis; information <br />gathering; negotiations; development of strategies. <br />• The Consultant shall carry out the instructions received from the City and shall cooperate <br />with the City and other agencies. <br />• The Consultant has total responsibility for the accuracy and completeness of the work <br />produced. The work will be reviewed by the City for conformity with the requirements of <br />the Agreement. Reviews by the City may NOT include a detailed review for the accuracy <br />of items submitted. The responsibility for accuracy and completeness of such items <br />remains solely that of Consultant. <br />• The Consultant shall be responsible for coordination and supervision of all work <br />performed by its sub-consultants. The Consultant shall review all work performed by its <br />sub-consultants and the responsibility for accuracy and completeness of work performed <br />remains solely that of Consultant. <br />• The Consultant shall have a Quality Control Plan in effect during the entire time work is <br />being performed under the Agreement. The Quality Control Plan shall establish a process <br />whereby work products are independently checked, corrected and back checked. All <br />projects related correspondences and documents should be maintained and bound in <br />appropriate project files. <br />• The Consultant shall diligently work on each assignment and complete each task in <br />Page 12 of 48 <br />19H-14
The URL can be used to link to this page
Your browser does not support the video tag.