My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-20
Clerk
>
Resolutions
>
PLANNING COMMISION
>
2009
>
2009-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:54:35 PM
Creation date
10/18/2010 10:38:55 AM
Metadata
Fields
Template:
PBA
Doc Type
Resolution
Doc #
SPR09-03
Date
12/14/2009
Notes
6 E MacArthur Pl
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fee and parkland dedication or in-lieu payments have been <br />made. <br />51. Prior to issuance of building permits, the project developer shall <br />submit a Construction Plan to Santa Ana Fire Department. The <br />plan must be consistent with the Fire Department Fire Code <br />requirements and must show that emergency access to the <br />construction site is adequate. <br />52. Prior to issuance of building permits, the project developer shall <br />provide evidence to the Santa Ana Fire Department that the <br />proposed fire protection and life saving systems incorporated in <br />the project are adequate. <br />53. Prior to issuance of building permits, the project developer shall <br />submit the final design of the project, including fire sprinklers <br />system design to the Santa Ana Fire Department for approval. <br />54. Prior to issuance of building occupancy permits, the project <br />developer in cooperation with the City of Santa Ana, shall <br />provide for the restriping of the outside southbound through lane <br />at the intersection of Main Street and Sunflower to a shared <br />through and right turn lane. <br />55. Prior to issuance of building occupancy permits, the project <br />developer in cooperation with the City of Santa Ana, shall <br />provide for the restriping the shared through right-turn lane at <br />Hutton Centre Drive and MacArthur Boulevard to provide an <br />exclusive through lane and construct a second northbound right <br />turn lane for the northbound traffic. <br />56. Prior to issuance of building occupancy permits, the project <br />developer shall pay for the construction of a third eastbound <br />through lane on MacArthur Boulevard between Hutton Centre <br />Drive/Imperial Promenade and the SR-55 northbound on-ramp. <br />57. Prior to the issuance of building occupancy permits, the project <br />developer in cooperation with the City of Santa Ana, shall <br />provide for the installation of a traffic signal at Hutton Centre <br />Drive and Hutton Centre Loop. <br />58. Prior to issuance of building occupancy permits, the project <br />developer shall pay for the construction of a fourth eastbound <br />lane on MacArthur Boulevard between Hutton Centre <br />Drive/Imperial Promenade and the SR-55 southbound on-ramp. <br />• <br />Resolution No. 2009-20 <br />Page 11 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.