15. Prior to the issuance of a building permit, the project developer shall provide <br />evidence to the Planning Manager that an FAA "No Hazard" determination has <br />been secured. The project developer shall demonstrate compliance with any <br />conditions imposed by the FAA. <br />16. During construction, the contractor shall be required to comply with SCAQMD <br />Fugitive Dust Rule 403 to suppress dust generated by construction operations. <br />To ensure compliance with SCAQMD Fugitive Dust Rule 403, grading plans and <br />demolition plans for the proposed project shall reflect the following notes: <br />• All materials excavated or graded shall be sufficiently watered to prevent <br />excessive amounts of dust. Watering with complete coverage shall occur at least <br />twice daily, once in the late morning and once after work is done for the day. <br />• All clearing and earthwork activities shall cease during periods of high winds <br />(winds greater than 25 mph averaged over one hour) or during Stage 1 or Stage 2 <br />smog episodes. <br />• Internal roadways and project site entry and exit points shall be cleaned at the <br />end of each day by the project developer. Dust and debris from construction <br />activities that migrates or is carried onto MacArthur Boulevard or Main Street <br />adjacent to the project site shall also be cleaned each day. <br />• • All material transported off-site shall either be sufficiently watered or securely <br />covered to prevent excessive amounts of dust. Haul trucks leaving the site shall <br />have a minimum freeboard distance of 12 inches. <br />• Construction equipment leaving the project site shall be wheel <br />washed. <br />• The amount of area disturbed by clearing and earthwork <br />activities shall be minimized at all times. <br />• Equipment engines shall be maintained in good condition and in <br />proper tune according to manufacturer's specifications. <br />• To the extent feasible, construction equipment shall use <br />alternative clean fuels such as compressed natural gas <br />equipment with oxidation catalysts. If alternative clean fuels are <br />not feasible, gasoline powered construction equipment shall be <br />used. <br />• Construction equipment operating on diesel fuel shall use <br />particulate filters or low sulfur diesel. <br />• <br />Resolution 2009-20 <br />Page 5 of 15 <br />