My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-20
Clerk
>
Resolutions
>
PLANNING COMMISION
>
2009
>
2009-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:54:35 PM
Creation date
10/18/2010 10:38:55 AM
Metadata
Fields
Template:
PBA
Doc Type
Resolution
Doc #
SPR09-03
Date
12/14/2009
Notes
6 E MacArthur Pl
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15. Prior to the issuance of a building permit, the project developer shall provide <br />evidence to the Planning Manager that an FAA "No Hazard" determination has <br />been secured. The project developer shall demonstrate compliance with any <br />conditions imposed by the FAA. <br />16. During construction, the contractor shall be required to comply with SCAQMD <br />Fugitive Dust Rule 403 to suppress dust generated by construction operations. <br />To ensure compliance with SCAQMD Fugitive Dust Rule 403, grading plans and <br />demolition plans for the proposed project shall reflect the following notes: <br />• All materials excavated or graded shall be sufficiently watered to prevent <br />excessive amounts of dust. Watering with complete coverage shall occur at least <br />twice daily, once in the late morning and once after work is done for the day. <br />• All clearing and earthwork activities shall cease during periods of high winds <br />(winds greater than 25 mph averaged over one hour) or during Stage 1 or Stage 2 <br />smog episodes. <br />• Internal roadways and project site entry and exit points shall be cleaned at the <br />end of each day by the project developer. Dust and debris from construction <br />activities that migrates or is carried onto MacArthur Boulevard or Main Street <br />adjacent to the project site shall also be cleaned each day. <br />• • All material transported off-site shall either be sufficiently watered or securely <br />covered to prevent excessive amounts of dust. Haul trucks leaving the site shall <br />have a minimum freeboard distance of 12 inches. <br />• Construction equipment leaving the project site shall be wheel <br />washed. <br />• The amount of area disturbed by clearing and earthwork <br />activities shall be minimized at all times. <br />• Equipment engines shall be maintained in good condition and in <br />proper tune according to manufacturer's specifications. <br />• To the extent feasible, construction equipment shall use <br />alternative clean fuels such as compressed natural gas <br />equipment with oxidation catalysts. If alternative clean fuels are <br />not feasible, gasoline powered construction equipment shall be <br />used. <br />• Construction equipment operating on diesel fuel shall use <br />particulate filters or low sulfur diesel. <br />• <br />Resolution 2009-20 <br />Page 5 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.