Laserfiche WebLink
• i. All antennas shall be covered with "pine antenna socks" that match the <br />approved foliage color. <br />j. All "stand-off mounts" and support pipe mounts shall be concealed <br />behind antennas and painted a darker shade of green (or black) with a <br />"flat" paint finish to reduce reflection and visibility of the mounting. <br />k. Include the tree specifications (selected manufacturers and models) <br />with photo simulations (also a site plan review requirement). <br />I. Show the location of the GPS antenna on all elevations. <br />m. Provide a "unistrut" detail for the utility cabinet; an "H-frame" is not <br />acceptable. <br />n. Provide a note on the plans stating "install underground utilities <br />sleeving for two carriers during construction of the structure." The <br />sleeving should go underground through the caisson; shrouds on the <br />outside of the pole are not acceptable. All utilities, coaxial and conduit <br />for the project should be designed to be underground -this should <br />eliminate the need for an "ice bridge." <br />• o. All exterior conduit and electrical meters shall be installed and <br />screened in one metal enclosure painted to match the structure. <br />3. Each major wireless communication facility approved pursuant to the <br />Santa Ana Wireless Communications Ordinance (Section 198-198.13 of <br />the Santa Ana Municipal Code) shall be approved for a period not to <br />exceed 10 years. <br />4. Provide a map showing existing locations of all other wireless <br />communication facilities, and a before and after coverage for the specific <br />location. <br />5. The new equipment cabinets shall be screened by a six-foot, eight-inch <br />high block wall using the same rock aggregate materials as the Sprint <br />equipment enclosure and the exterior of the existing building. The <br />wrought iron door shall include a metal mesh screening to match the door <br />to the Sprint equipment enclosure <br />6. Clarify that Keynote No. 9 "coax cable vertical ladder," is not similar to an <br />ice bridge. <br />7. Prior to submittal into building plan check, provide a note on the plans <br />• stating: <br />Resolution No. 2008-27 <br />Page 5 of 7 <br />