Laserfiche WebLink
. 12. The permit applicant shall provide a coverage and cell site location map <br />for each existing and proposed facility in Santa Ana. <br />13. The proposed wireless communication structure must be engineered to <br />allow the co-location of other service providers. <br />14. Locate all equipment and related appurtenances (Appleton plug and <br />electric meter) on the inside of the equipment enclosure or inside the <br />building and underground all electrical power from the utility source shown <br />on the approved site plan. <br />15. Conditional Use Permit No. 2007-17 expires 10 years from the date of City <br />Council approval. <br />16. Metro PCS, the leasee for the wireless facility, agrees to remove any <br />graffiti on the proposed equipment cabinet and wrought iron perimeter <br />fence. Graffiti removal must be done within 24 hours from occurrence. <br />u <br /> <br />Resolution No. 2008-05 <br />Page 7 of 8 <br />