Laserfiche WebLink
OCTA “Go Local” ProcessOCTA “Go Local” Process <br />•Identify transit concepts to link major activity & employment <br />centers to Metrolinkstations <br />Step 1 <br />•Identify wide range of routes & transit technologies <br />•Refine concepts in coordination with stakeholders & the public <br />We are here <br />•Conduct alternatives analysis, conceptual engineering & <br />environmental review on “reduced set” of concepts <br />Step 2 <br />•Refine cost estimates & develop funding plan <br />•Preliminary engineering (with FTA concurrence) <br />•Final design & construction <br />Step 3* <br />•Implementation <br />•Once Go Local programs are operating, OCTA will perform <br />additional upgrades to Metrolinkstations to ensure passengers <br />Step 4* <br />can connect seamlessly to the various transit services <br />5 <br />*Steps 3 and 4 not yet funded <br />