My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSA - SANTA ANA-GARDEN GROVE FIXED GUIDEWAY_COLOR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
10/18/2010
>
WSA - SANTA ANA-GARDEN GROVE FIXED GUIDEWAY_COLOR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:58:56 PM
Creation date
10/19/2010 12:04:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
WSA
Date
10/18/2010
Destruction Year
2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OCTA “Go Local” ProcessOCTA “Go Local” Process <br />•Identify transit concepts to link major activity & employment <br />centers to Metrolinkstations <br />Step 1 <br />•Identify wide range of routes & transit technologies <br />•Refine concepts in coordination with stakeholders & the public <br />We are here <br />•Conduct alternatives analysis, conceptual engineering & <br />environmental review on “reduced set” of concepts <br />Step 2 <br />•Refine cost estimates & develop funding plan <br />•Preliminary engineering (with FTA concurrence) <br />•Final design & construction <br />Step 3* <br />•Implementation <br />•Once Go Local programs are operating, OCTA will perform <br />additional upgrades to Metrolinkstations to ensure passengers <br />Step 4* <br />can connect seamlessly to the various transit services <br />5 <br />*Steps 3 and 4 not yet funded <br />
The URL can be used to link to this page
Your browser does not support the video tag.