Laserfiche WebLink
<br />• 12. The proposed wireless communication structure must be engineered to <br />allow the colocation of other service providers. <br />13. Locate all equipment and related appurtenances (appleton plug and <br />electric meter) on the inside of the equipment enclosure or inside the <br />building and underground all electrical power from the utility source shown <br />on the approved site plan. <br />14. The amendment to Conditional Use Permit No. 2002-18 expires five years <br />from the date of City Council approval. <br />15. The current carriers, Cingular Wireless and T-Mobile, are approved to <br />construct the 75-foot monopine and must meet all the conditions and <br />requirements for Conditional Use Permit No. 2002-18. All outstanding <br />permits must be closed prior to issuance of new building permits for the <br />third carrier, Metro PCS. <br />16. The front entrance gate to the property shall be upgraded to a metal frame <br />type gate and metal mesh installed as panels to screen the property from <br />public view. The metal gate frame and mesh shall be painted to match the <br />split face block wall. <br />17. The property owner shall be responsible for removal of any graffiti to the <br />• split face block walls around the perimeter of the property. Graffiti removal <br />must be done within 24 hours of the occurrence. <br /> <br />Resolution No. 2007-15 <br />Page 6 of 6 <br />