Laserfiche WebLink
• 17. Prior to issuance of a grading permit, the applicant shall provide two <br />copies of the Water Quality Management Plan that includes site <br />assessment, site design BMPs, applicable routine Source control BMPs, <br />selection and sizing of the Treatment Control BMPs, funding mechanisms <br />for long-term operation and maintenance and an operation and <br />Maintenance Plan. <br />18. Prior to issuance of building permit, the developer shall provide payment <br />of City of Santa Ana Federal Clean Water Protection Enterprise Fees. <br />19. Prior to issuance of building permits, the project developer shall construct <br />a raised median along First Street from the western driveway to the <br />Golden Circle Driveway. <br />20. Prior to issuance of building permits, the project developer shall submit a <br />Traffic Control Plan demonstrating how traffic along First Street would be <br />controlled during construction of the median. <br />• <br />• <br />Resolution No. 2006-006 <br />Page 7 of 8 <br />