Laserfiche WebLink
in on the project to make corrective work. Such work will be charged to the Contractor on a force <br />account basis with an additional callout charge of $150.00 for each callout. There will be assessed a <br />minimum of three-hour charge for labor on any callout. <br />C.4.2.8 Contractor Furnished Equipment. The Contractor shall provide all items necessary for <br />the performance of the contract including the following. <br />C.4.2.9 Tools. The Contractor shall provide all tools and repair equipment necessary for <br />maintenance and repair as specified in the Agreement. <br />C.4.2.10 Contractor Furnished Supplies. The Contractor shall furnish all supplies required for <br />his performance under the Agreement, including the following. <br />C.4.1.11 Chemicals. The Contractor shall furnish all chemicals and supplies to maintain the water <br />at the prescribed standards of purity and clarity including, but not limited to chlorine (liquid, tablets, <br />granular, or gaseous, depending on the type of dispensing system in use), soda ash, diatomaceous earth, <br />etc. <br />C.4.2.12 Test K its. The Contractor shall furnish test kits for the purpose of monitoring and <br />reporting chemical levels and conditions including but not limited to chlorine levels, pH levels, and <br />alkalinity of the water, etc. <br />C.4.2.13 Preventive Maintenance (PM) and Minor Repair Items. The Contractor shall provide <br />all PM and minor repair items including, but not limited to, lubricants, minor parts, fittings, gaskets, <br />bench stock, paint, degreasers, etc. for performance under the contract. <br />C.4.2.14 Cleaning Supplies. The Contractor shall furnish cleaning supplies required for <br />performance under the contract. <br />17 <br />