My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-26
Clerk
>
Resolutions
>
PLANNING COMMISION
>
2005
>
2005-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:55:14 PM
Creation date
10/20/2010 3:37:11 PM
Metadata
Fields
Template:
PBA
Doc Type
Resolution
Doc #
CUP05-21VA9509
Date
8/8/2005
Notes
3770 W McFadden Av
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• i) Relocate pull box, Southern California Edison vault, all other <br />utility boxes, utility poles and utility meters within 10' from the <br />proposed drive approaches. <br />j) Install pavement striping and signage as per approved <br />channelization plan. <br />k) Install "NO STOPPING ANYTIME" zone. <br />I) Relocate power poles as per approved improvement plan. <br />m) Construct and relocate ornamental street lights as per <br />approved improvement plan. <br />n) Close existing drive approaches with curb, gutter and full <br />width sidewalk. <br />o) Construct street tree wells and plant minimum 24 inch box <br />trees per City Standard #1124 at locations in accordance with <br />approved improvement plans. <br />7. McFadden Avenue <br />• ~ Construct signalized drive approach (W=56') and 25' curb radii <br />with two wheelchair ramps per approved improvement plan. <br />b) Construct drive approach near garden center per City Standard <br />#1112, Case 2 (Vw32', A=42', X=3') and per approved <br />improvement plan. <br />c) Construct most easterly drive approach per City Standard <br />#1112, Case 2 (W=40', A=50', X=3') and per approved <br />improvement plan. <br />d) Remove existing sidewalk and construct new full width 10' <br />wide sidewalk per approved improvement plan. <br />e) Remove existing curb and gutter and construct new curb and <br />gutter per approved improvement plan. <br />t) Remove existing paving and construct new paving to street <br />centerline per approved improvement plan. <br />g) Construct new landscaped medians per approved <br />improvement plan. <br /> <br />Exhibit B <br />Page 6 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.